Capacity
Capacity: sourceNESO · Open license, with creditMW
Queue position
PRO-001132
In-service date
(stated)
Location
Sundon 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Storage source: “Energy Storage System”
Connects at
Sundon 400kV SubstationConnection point1,150 MW active (3 of 4 projects).

Timeline

  • Stated In-service date stated by NESO.
  • Observed as under construction in NESO (source status: “Under Construction/Commissioning”).
  • NESO Transmission Entry Capacity (TEC) Register: Proposed cod 2025-09-05 → 2027-04-30.
  • NESO Transmission Entry Capacity (TEC) Register: status filed → under construction.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources NESO

Supported by National Energy SO Open Data

Sources

  • NESOOpen license, with credit · retrieved Nov 13, 2026Supported by National Energy SO Open Data

Every source and license · Attribution

View at source

Report a problem