Exact site not public
Map
SUNSHINE TWO in California: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Sunshine Two
Solar
As filed: SUNSHINE TWO
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 541A
- In-service date
- (stated)
- Location
- LOS ANGELES County, California (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Connects at
- Antelope-Neenach 66kVConnection point0 MW active (0 of 6 projects).
At this site
2 records at SUNSHINE TWOAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | SUNSHINE TWO this record | Solar | 20 | Withdrawn |
| Another phase high confidence | SUNSHINE FOUR | Solar | 20 | Withdrawn |
Also at this interconnection point (4)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- RUBY SOLAR PROJECT Solar, 20 MW, withdrawn at Antelope-Neenach 66kV
- FRV MOJAVE SOLAR 2 Solar, 20 MW, withdrawn at Antelope-Neenach 66kV
- SIERRA VIEW SOLAR IV Solar, 20 MW, withdrawn at Antelope-Neenach 66kV
- FAIRMONT SOLAR I Solar + storage, 20 MW, withdrawn at Antelope-Neenach 66kV
Sources CAISO
Timeline
- Observed as withdrawn in CAISO.
- Stated In-service date stated by CAISO.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources CAISO