Show on map

Exact site not public

Sweetwater 2 repower

Wind

Capacity
Capacity: sourceERCOT · Open licenseMW
In-service date
(stated)
Location
Nolan County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Wind source: “Wind - Wind Turbine”
Connects at
71050 Bitter Creek 345kVConnection point3 MW active (1 of 3 projects).

At this site

2 records at Sweetwater 2 repowerAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Sweetwater 2 repower this record Wind 7.3 Built
Another phase high confidence Sweetwater 1 repower Wind 3 Contracted
Also at this interconnection point (1)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

  • Maryneal Wind Wind, 182.4 MW, built at 71050 Bitter Creek 345kV

Sources ERCOT

Sources

  • ERCOTTerms of use · retrieved Nov 4, 2026

Attribution

Timeline

  • Stated In-service date stated by ERCOT.
  • Observed as built in ERCOT (source status: “Completed”).
  • ERCOT GIS Report (Generator Interconnection Status): Proposed cod 2024-11-30 → 2026-12-30.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources ERCOT

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution