- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 17INR0068
- In-service date
- (stated)
- Location
- Nolan County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- Leeward Energy
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Wind source: “Wind - Wind Turbine”
- Connects at
- 71050 Bitter Creek 345kVConnection point3 MW active (1 of 3 projects).
At this site
2 records at Sweetwater 2 repowerAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Sweetwater 2 repower this record | Wind | 7.3 | Built |
| Another phase high confidence | Sweetwater 1 repower | Wind | 3 | Contracted |
Also at this interconnection point (1)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Maryneal Wind Wind, 182.4 MW, built at 71050 Bitter Creek 345kV
Sources ERCOT
Timeline
- Stated In-service date stated by ERCOT.
- Observed as built in ERCOT (source status: “Completed”).
- ERCOT GIS Report (Generator Interconnection Status): Proposed cod 2024-11-30 → 2026-12-30.
“Stated” dates are the source’s plan, not a commitment.