Tehuacana Creek Solar: the source's site coordinate and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Tehuacana Creek Solar
Solar + storage
Key facts
Solar + storage Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Queue position
- 24INR0188
- In-service date
- (stated)
- Location
- Navarro County, Texas
Details
Who’s behind it
- Developer
- Parliament Energy Holdings LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar + storage source: “Solar - Photovoltaic Solar”
- Capacity (MW)
- 923.4 Capacity is the interconnection request plus the generators, listed under Sources, whose technology no request covers.
- Connects at
- Tap 345kV 3381 Big Brown – 68091 Navarro circuitConnection point923.4 MW active (1 of 1 projects).
- EIA plants
- 65855, 65856 4 generatorsEIA generatorsPlant 65855 TE1BS, TE1PVPlant 65856 TE2BS, TE2PV
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Whistle Solar Studied | Solar | 5.1 mi | 56.3 |
| Main Horn Solar Studied | Solar | 5.6 mi | 100.4 |
| Oak Valley Solar Studied | Solar | 8.5 mi | 251.3 |
| Armadillo Solar Center Under construction | Solar | 13.7 mi | 150.5 |