Tehuacana Creek Solar

Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Navarro County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar + storage source: “Solar - Photovoltaic Solar”
Capacity (MW)
923.4 Capacity is the interconnection request plus the generators, listed under Sources, whose technology no request covers.
Connects at
Tap 345kV 3381 Big Brown – 68091 Navarro circuitConnection point923.4 MW active (1 of 1 projects).
EIA plants
65855, 65856 4 generatorsEIA generatorsPlant 65855 TE1BS, TE1PVPlant 65856 TE2BS, TE2PV

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Whistle Solar Studied Solar 5.1 mi 56.3
Main Horn Solar Studied Solar 5.6 mi 100.4
Oak Valley Solar Studied Solar 8.5 mi 251.3
Armadillo Solar Center Under construction Solar 13.7 mi 150.5

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution