Show on map

Exact site not public

TempleCloud Gas

Gas, reciprocating engine

Capacity
Capacity: sourceERCOT · Open licenseMW
In-service date
(stated)
Location
Bell County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Gas, reciprocating engine source: “Gas - Internal Combustion Engine, eg. Reciprocating”
Connects at
Tap #3414 Temple Switch - #3780 Tower Switch 345kV DCKT LineConnection point1,776.6 MW active (2 of 2 projects).

Timeline

  • Stated In-service date stated by ERCOT.
  • Observed as studied in ERCOT (source status: “Active”).
  • First published from ERCOT GIS Report (Generator Interconnection Status).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources ERCOT

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem