Show on map
- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
Twelvemile Solar 3: the source's site coordinate and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Twelvemile Solar 3
Solar
Key facts
Solar Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Mayes County, Oklahoma
Details
Who’s behind it
- Developer
- Leeward Asset Management, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 68089 generator TS03
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Chimney Rock AOI (Pryor data centre) Filed | Large load | 8.4 mi | |
| MYALL LLC / PRY DATA STORAGE FACILITY Built | Large load | 8.6 mi | |
| Grand River Energy Center Solar Postponed | Solar | 10.1 mi | 84 |
| GREC Under construction | Gas, combustion turbine | 10.3 mi | 594 |
Sources FAA OE/AAA · EPA ICIS-Air · EIA-860M