Show on map

Exact site not public

Vernon Power Plant

Gas, combined cycle

As filed: VERNON POWER PLANT

Key facts

Gas, combined cycle Withdrawn (what this status means)
Capacity
Capacity: sourceCAISO · Open license, with creditMW
In-service date
(stated)
Location
LOS ANGELES County, California (exact site not public)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Connects at
Laguna Bell Sub 230 kV BusConnection point750 MW active (3 of 7 projects).

At this site

2 records at VERNON POWER PLANTAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing VERNON POWER PLANT this record Gas, combined cycle 610 Withdrawn
Later re-filing, withdrawn low confidence VERNON POWER PLANT EXPANSION PROJECT Gas, combined cycle 304 Withdrawn
Also at this interconnection point (5)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

Sources CAISO

Sources

Attribution

Timeline

  • Observed as withdrawn in CAISO.
  • Stated In-service date stated by CAISO.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources CAISO

Sources

  • CAISOOpen license, with credit · retrieved Nov 20, 2026Source: California ISO

Every source and license · Attribution

View at source

Report a problem