Vouno Ornithokathisma wind farm --Paparitsa wind farm -- — Announced · Wind · 26.4 MW · 2.9 km awayBarbas wind farm -- — Canceled · Wind · 15 MW · 3.7 km awayPlakoutsovouno Maloura Kokkinovrachos wind farm -- — Wind · 42.8 MW · 5.0 km awayStrongelo Vouno wind farm -- — Announced · Wind · 30.6 MW · 6.8 km awayTsiriphi Megala Dedra wind farm -- — Canceled · Wind · 11.5 MW · 8.5 km awaySkepasto wind farm -- — Announced · Wind · 22 MW · 12.0 km awayAgios Athanasios solar project II -- — Announced · Solar · 5 MW · 13.0 km awayMelissovouni wind farm -- — Canceled · Wind · 29.4 MW · 15.7 km awayVoulomeno solar farm -- — Canceled · Solar · 1.9 MW · 16.9 km awayMenelou wind farm -- — Under construction · Wind · 22.5 MW · 18.8 km awaySgortsa solar farm -- — Announced · Solar · 190 MW · 20.2 km away
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Vouno Ornithokathisma wind farm --

Wind

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Peloponnese, Western Greece and the Ionian, Greece

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Wind source: “wind / Onshore”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Paparitsa wind farm -- Announced Wind 2.9 km 26.4
Barbas wind farm -- Canceled Wind 3.7 km 15
Plakoutsovouno Maloura Kokkinovrachos wind farm -- Unknown Wind 5.0 km 42.8
Strongelo Vouno wind farm -- Announced Wind 6.8 km 30.6
Tsiriphi Megala Dedra wind farm -- Canceled Wind 8.5 km 11.5
Skepasto wind farm -- Announced Wind 12.0 km 22
Agios Athanasios solar project II -- Announced Solar 13.0 km 5
Melissovouni wind farm -- Canceled Wind 15.7 km 29.4
Voulomeno solar farm -- Canceled Solar 16.9 km 1.9
Menelou wind farm -- Under construction Wind 18.8 km 22.5
Sgortsa solar farm -- Announced Solar 20.2 km 190

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution