Show on map
Wales End Road Cavendish solar project --Water Hall Farm Waterhall Road solar farm -- — Announced · Solar · 35 MW · 10.1 km awayRogers Farm solar project -- — Solar · 15 MW · 15.5 km awayCavenham Quarry Cavenham Heath solar project -- — Announced · Solar · 1.3 MW · 22.9 km awayKentishes solar farm 2 — Announced · Solar · 16.5 MW · 23.0 km awayIngham solar farm -- — Canceled · Solar · 26 MW · 23.1 km awayIngham North Solar -- — Announced · Solar · 14.2 MW · 23.9 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Wales End Road Cavendish solar project --

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
England, United Kingdom

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Water Hall Farm Waterhall Road solar farm -- Announced Solar 10.1 km 35
Rogers Farm solar project -- Unknown Solar 15.5 km 15
Cavenham Quarry Cavenham Heath solar project -- Announced Solar 22.9 km 1.3
Kentishes solar farm 2 Announced Solar 23.0 km 16.5
Ingham solar farm -- Canceled Solar 23.1 km 26
Ingham North Solar -- Announced Solar 23.9 km 14.2

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution