Show on map
- Combustion
- Wind & solar
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- In development
- Under construction
Werk 1 Otto Meister Straße 2 solar project --: the source's site coordinate and 5 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Werk 1 Otto Meister Straße 2 solar project --
Solar
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Baden-Württemberg, Germany
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar source: “utility-scale solar / PV”
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Solarpark Öhringen solar project -- Announced | Solar | 4.4 km | 6.4 |
| Solarpark Ulrichsberg solar project -- Announced | Solar | 12.6 km | 11.3 |
| Bürger PV Berlichingen 1 solar farm -- Announced | Solar | 13.1 km | 20 |
| Solarpark Adelsheim P21 096 solar project -- Announced | Solar | 18.6 km | 2.5 |
| Heilbronn power station Unit A, timepoint 1 Under construction | Gas, combined cycle | 22.0 km | 675 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.