Wether HillLongburn wind farm -- — Canceled · Wind · 72 MW · 1.0 km awayLorg Wind Farm — Studied · Wind · 69.5 MW · 6.6 km awayMargree Wind Farm — Studied · Wind · 50 MW · 8.0 km awayShepherd'S Rig wind farm -- — Announced · Wind · 70.2 MW · 8.2 km awayFell Wind Farm — Filed · Wind · 50 MW · 10.4 km awayEuchanhead Wind Farm — Studied · Wind · 112 MW · 11.0 km awayKnockman Hill wind farm -- — Announced · Wind · 5 MW · 11.0 km awayKnockman Hill, Milnmark Farm wind farm -- — Announced · Wind · 5 MW · 11.6 km awayHill Of Stroupster wind farm -- — Announced · Wind · 66 MW · 11.9 km awayLongburn I wind farm -- — Wind · 23 MW · 14.3 km awayQuantans Hill Wind Farm — Filed · Wind · 95 MW · 14.3 km awayHill of Carlincraig wind turbines -- — Announced · Wind · 10.3 MW · 17.3 km awayAshmark Hill Community wind farm -- — Canceled · Wind · 21 MW · 17.9 km awayTorrs Hill wind farm -- — Under construction · Wind · 4 MW · 18.5 km awaySouth Kyle 2 Wind farm — Filed · Wind + storage · 92.4 MW · 19.3 km awayEnoch Hill — Built · Wind + storage · 69 MW · 19.4 km awayPencloe Windfarm — Under construction · Wind + storage · 115 MW · 21.0 km awayKnockshinnoch wind farm -- — Announced · Wind · 4 MW · 21.1 km awayGlenmuckloch Wind Farm — Permitted · Wind · 33.6 MW · 21.7 km awayBlackwood wind farm -- — Wind · 10.3 MW · 22.1 km awayLethans Wind Farm — Permitted · Wind · 132 MW · 22.2 km awayLowther Hills wind farm -- — Wind · 147 MW · 24.8 km away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Wether Hill

Wind

Capacity
Capacity: sourceNESO · Open license, with creditMW
Queue position
PRO-001527
In-service date
(stated)
Location
Scotland, United Kingdom

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Wind source: “Wind Onshore”
Capacity (MW)
66 Capacity is the interconnection request in NESO Transmission Entry Capacity (TEC) Register. The 1 generator listed in Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) (listed under Sources) total 22 MW nameplate.
Connects at
Wether Hill 132/33KV SubstationConnection point66 MW active (1 of 1 projects).

Timeline

  • Stated In-service date stated by NESO.
  • Observed as filed in NESO (source status: “Scoping”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources NESO · GEM

Supported by National Energy SO Open Data

Sources

  • NESOOpen license, with credit · retrieved Nov 11, 2026Supported by National Energy SO Open Data
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Longburn wind farm -- Canceled Wind 1.0 km 72
Lorg Wind Farm Studied Wind 6.6 km 69.5
Margree Wind Farm Studied Wind 8.0 km 50
Shepherd'S Rig wind farm -- Announced Wind 8.2 km 70.2
Fell Wind Farm Filed Wind 10.4 km 50
Euchanhead Wind Farm Studied Wind 11.0 km 112
Knockman Hill wind farm -- Announced Wind 11.0 km 5
Knockman Hill, Milnmark Farm wind farm -- Announced Wind 11.6 km 5
Hill Of Stroupster wind farm -- Announced Wind 11.9 km 66
Longburn I wind farm -- Unknown Wind 14.3 km 23
Quantans Hill Wind Farm Filed Wind 14.3 km 95
Hill of Carlincraig wind turbines -- Announced Wind 17.3 km 10.3
Ashmark Hill Community wind farm -- Canceled Wind 17.9 km 21
Torrs Hill wind farm -- Under construction Wind 18.5 km 4
South Kyle 2 Wind farm Filed Wind + storage 19.3 km 92.4
Enoch Hill Built Wind + storage 19.4 km 69
Pencloe Windfarm Under construction Wind + storage 21.0 km 115
Knockshinnoch wind farm -- Announced Wind 21.1 km 4
Glenmuckloch Wind Farm Permitted Wind 21.7 km 33.6
Blackwood wind farm -- Unknown Wind 22.1 km 10.3
Lethans Wind Farm Permitted Wind 22.2 km 132
Lowther Hills wind farm -- Unknown Wind 24.8 km 147

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 11, 2026Supported by National Energy SO Open Data

Attribution