Show on map
Wheal Jane Sustainability wind farm --United Downs geothermal power plant -- — Under construction · Geothermal · 2 MW · 3.2 km awayRoddas The Creamery solar project -- — Announced · Solar · 2.6 MW · 5.6 km awayTreliever Cross Research Fields, Longdowns wind farm -- — Announced · Wind · 1 MW · 8.1 km awayTruthan Barton wind farm original — Canceled · Wind · 12.5 MW · 10.9 km awayTruthan Barton wind farm resubmission — Canceled · Wind · 12.5 MW · 10.9 km awayButteriss solar project -- — Solar · 3 MW · 11.2 km awayCarland Cross solar farm -- — Under construction · Solar · 10 MW · 12.5 km awayFiddlers Green solar farm -- — Announced · Solar · 4.7 MW · 12.9 km awayCopper Bottom solar farm -- — Announced · Solar · 30 MW · 15.3 km awayThe Coach House Gwinear Lane Speedwell solar farm -- — Announced · Solar · 40 MW · 17.0 km awayTreworgans wind farm -- — Wind · 2 MW · 17.2 km awayScarcewater Tip wind farm -- — Wind · 6.9 MW · 19.4 km awayLoggans Roundabout Loggans Road solar project -- — Announced · Solar · 2.5 MW · 20.3 km awayLand At Pines Tip wind farm -- — Wind · 2.7 MW · 20.5 km awayBunkers Hill solar farm -- — Canceled · Solar · 5 MW · 20.5 km awayTwinHub Offshore Demonstration wind farm -- — Announced · Offshore wind · 32 MW · 22.4 km awayLower Longstones, St Mewan wind farm -- — Announced · Wind · 4.1 MW · 24.6 km awayBeinn Thulabaigh Wind Turbine -- — Announced · Wind · 4.3 MW · 24.7 km away
  • Clean firm
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Wheal Jane Sustainability wind farm --

Wind

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
England, United Kingdom

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Wind source: “wind / Onshore”

Timeline

  • Observed as unknown in GEM (source status: “shelved”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
United Downs geothermal power plant -- Under construction Geothermal 3.2 km 2
Roddas The Creamery solar project -- Announced Solar 5.6 km 2.6
Treliever Cross Research Fields, Longdowns wind farm -- Announced Wind 8.1 km 1
Truthan Barton wind farm original Canceled Wind 10.9 km 12.5
Truthan Barton wind farm resubmission Canceled Wind 10.9 km 12.5
Butteriss solar project -- Unknown Solar 11.2 km 3
Carland Cross solar farm -- Under construction Solar 12.5 km 10
Fiddlers Green solar farm -- Announced Solar 12.9 km 4.7
Copper Bottom solar farm -- Announced Solar 15.3 km 30
The Coach House Gwinear Lane Speedwell solar farm -- Announced Solar 17.0 km 40
Treworgans wind farm -- Unknown Wind 17.2 km 2
Scarcewater Tip wind farm -- Unknown Wind 19.4 km 6.9
Loggans Roundabout Loggans Road solar project -- Announced Solar 20.3 km 2.5
Land At Pines Tip wind farm -- Unknown Wind 20.5 km 2.7
Bunkers Hill solar farm -- Canceled Solar 20.5 km 5
TwinHub Offshore Demonstration wind farm -- Announced Offshore wind 22.4 km 32
Lower Longstones, St Mewan wind farm -- Announced Wind 24.6 km 4.1
Beinn Thulabaigh Wind Turbine -- Announced Wind 24.7 km 4.3

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution