Wheatridge Optimization II: the source's site coordinate and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Wheatridge Optimization II
Solar + storage
Key facts
Solar + storage Under construction (source status: (U) Under construction, less than or equal to 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- Bonneville Power Administration (BPAT)
- In-service date
- (stated)
- Location
- Morrow County, Oregon
Details
Who’s behind it
- Developer
- Wheatridge Optimization II, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar + storage source: “Solar Photovoltaic + Batteries”
- Capacity (MW)
- 190 Capacity is the sum of the 2 generators listed under Sources.
- EIA plant
- 70450 2 generatorsEIA generatorsPlant 70450 BA1, PV1
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Wheatridge Optimization I Under construction | Solar + storage | 0.3 mi | 175 |
| Sunstone Solar Filed | Solar + storage | 4.5 mi | 2,400 |
| Tutuilla Solar Under construction | Solar | 5.6 mi | 1.6 |