White Tank Energy StorageMicrosoft Phx 83 (El Mirage data centre) — Filed · Large load · AZ · 4.5 mi awayVantage AZ15 — Under construction · Large load · AZ · 4.7 mi awayMICROSOFT CORP - OLIVE AVE — Built · Large load · AZ · 4.8 mi awayCOMPASS DATACENTERS PHX I — Built · Large load · AZ · 5.1 mi awayCOMPASS DATA CENTER - MOONRAKER — Built · Large load · AZ · 5.3 mi awayCompass Datacenter — Under construction · Large load · AZ · 5.5 mi awayAligned Phx 7 — Filed · Large load · AZ · 5.8 mi awayPrime Data Center — Under construction · Large load · AZ · 5.9 mi awayCrane (Avondale data centre) — Filed · Large load · AZ · 6.0 mi awaySierra Luna Energy Storage — Announced · Storage · AZ · 150 MW · 6.2 mi awayStream Data Center — Built · Large load · AZ · 6.3 mi awayMERIT 2 — Built · Large load · AZ · 6.3 mi awayPHX16 Data Center — Filed · Large load · AZ · 6.4 mi awayQTS DC13 - Temp Crane - NE — Filed · Large load · AZ · 6.6 mi awayQTS PHX3 Data Center — Built · Large load · AZ · 6.7 mi awayPHX 70 - MICROSOFT DATA CENTER — Built · Large load · AZ · 7.0 mi awayPHX73 (Goodyear data centre) — Filed · Large load · AZ · 7.0 mi awayVantage Data Center 21 — Under construction · Large load · AZ · 7.1 mi awayMICROSOFT CORP - CITRUS RD — Built · Large load · AZ · 7.3 mi awayQTS DATA CENTER — Under construction · Large load · AZ · 10.4 mi awayDesert Bloom — Under construction · Storage · AZ · 150 MW · 14.2 mi away
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

White Tank Energy Storage

Storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Arizona Public Service (AZPS)
In-service date
(stated)
Location
Maricopa County, Arizona

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Storage source: “Batteries”
EIA plant
70033 generator WT001

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2027-03-01 → 2027-04-01.
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Microsoft Phx 83 (El Mirage data centre) Filed Large load 4.5 mi
Vantage AZ15 Under construction Large load 4.7 mi
MICROSOFT CORP - OLIVE AVE Built Large load 4.8 mi
COMPASS DATACENTERS PHX I Built Large load 5.1 mi
COMPASS DATA CENTER - MOONRAKER Built Large load 5.3 mi
Compass Datacenter Under construction Large load 5.5 mi
Aligned Phx 7 Filed Large load 5.8 mi
Prime Data Center Under construction Large load 5.9 mi
Crane (Avondale data centre) Filed Large load 6.0 mi
Sierra Luna Energy Storage Announced Storage 6.2 mi 150
Stream Data Center Built Large load 6.3 mi
MERIT 2 Built Large load 6.3 mi
PHX16 Data Center Filed Large load 6.4 mi
QTS DC13 - Temp Crane - NE Filed Large load 6.6 mi
QTS PHX3 Data Center Built Large load 6.7 mi
PHX 70 - MICROSOFT DATA CENTER Built Large load 7.0 mi
PHX73 (Goodyear data centre) Filed Large load 7.0 mi
Vantage Data Center 21 Under construction Large load 7.1 mi
MICROSOFT CORP - CITRUS RD Built Large load 7.3 mi
QTS DATA CENTER Under construction Large load 10.4 mi
Desert Bloom Under construction Storage 14.2 mi 150