Show on map
Exact site not public
Map
WILLOW SPRINGS SOLAR 3 in California: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Willow Springs Solar 3
Storage
As filed: WILLOW SPRINGS SOLAR 3
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 1076
- Location
- KERN County, California (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Storage
- Connects at
- Whirlwind Substation 230kVConnection point1,700.6 MW active (7 of 45 projects).
At this site
3 records at WILLOW SPRINGS 2At this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | WILLOW SPRINGS 2 | Solar | 100 | Built |
| Co-located, other technology high confidence | WILLOW SPRINGS SOLAR 4 | Storage | 75 | Built |
| Co-located, other technology high confidence | WILLOW SPRINGS SOLAR 3 this record | Storage | 50 | Built |
Also at this interconnection point (42)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- EUISMOD Storage, 600 MW, contracted at Whirlwind Substation 230kV
- Willow Rock Energy Storage Center Storage, 500 MW, contracted at Whirlwind Substation 230kV
- ROSAMOND WEST SOLAR Solar + storage, 299.6 MW, contracted at Whirlwind Substation 230kV
- NORTH ROSAMOND SOLAR Solar + storage, 153 MW, contracted at Whirlwind Substation 230kV
- KEYHOLE WIND Wind, 100 MW, contracted at Whirlwind Substation 230kV
- Solar Star 3 Solar + storage, 24 MW, under construction at Whirlwind Substation 230kV
- Solar Star 4 Solar + storage, 24 MW, under construction at Whirlwind Substation 230kV
- AV SOLAR ONE PROJECT Solar, 250 MW, built at Whirlwind Substation 230kV
- WILLY 9 Solar + storage, 250 MW, built at Whirlwind Substation 230kV
- ANTELOPE VALLEY COMPLEX Solar + storage, 150 MW, built at Whirlwind Substation 230kV
- CATALINA SOLAR Solar, 145.4 MW, built at Whirlwind Substation 230kV
- PACIFIC WIND Wind, 141.3 MW, built at Whirlwind Substation 230kV
- TROPICO SOLAR Solar + storage, 110 MW, built at Whirlwind Substation 230kV
- ROSAMOND SOUTH EAST Solar + storage, 101.7 MW, built at Whirlwind Substation 230kV
- AVALON HYBRID Solar, 100 MW, built at Whirlwind Substation 230kV
- Camino Solar Hybrid Solar + storage, 54.3 MW, built at Whirlwind Substation 230kV
- CYCLONE SOLAR Solar + storage, 40 MW, built at Whirlwind Substation 230kV
- KINGBIRD SOLAR A (FKA AV SOLAR RANCH 2-A) Solar, 20 MW, built at Whirlwind Substation 230kV
- KINGBIRD SOLAR B (FKA AV SOLAR RANCH 2-B Solar, 20 MW, built at Whirlwind Substation 230kV
- ALTA 12 Wind, 1,150 MW, withdrawn at Whirlwind Substation 230kV
- ALTA Q175 (FKA ALTA 11) Wind, 650 MW, withdrawn at Whirlwind Substation 230kV
- METEORITE SOLAR Solar + storage, 400 MW, withdrawn at Whirlwind Substation 230kV
- VENADO VALLEY 1 Solar + storage, 300 MW, withdrawn at Whirlwind Substation 230kV
- RESONATE Solar + storage, 300 MW, withdrawn at Whirlwind Substation 230kV
- EON VISION WIND Wind, 277.6 MW, withdrawn at Whirlwind Substation 230kV
- GASKELL SOLAR GENERATING STATION Solar thermal, 264 MW, withdrawn at Whirlwind Substation 230kV
- BRIGHTSOURCE AV PROJECT Solar thermal, 260 MW, withdrawn at Whirlwind Substation 230kV
- ROSY 9 Solar, 250 MW, withdrawn at Whirlwind Substation 230kV
- ARROW Solar + storage, 250 MW, withdrawn at Whirlwind Substation 230kV
- DRACO SOLAR Solar + storage, 250 MW, withdrawn at Whirlwind Substation 230kV
- LINWOOD SOLAR FARM Solar + storage, 205.2 MW, withdrawn at Whirlwind Substation 230kV
- LONGSPUR 11 Solar + storage, 175 MW, withdrawn at Whirlwind Substation 230kV
- MOJAVALON I Solar, 146 MW, withdrawn at Whirlwind Substation 230kV
- FAIRMONT SOLAR GENERATING STATION Solar thermal, 141 MW, withdrawn at Whirlwind Substation 230kV
- DESERT VIEW SUNTOWER Solar, 141 MW, withdrawn at Whirlwind Substation 230kV
- ALTA Q153 (FKA ALTA 7) Wind, 100 MW, withdrawn at Whirlwind Substation 230kV
- WILLOW SOLAR Solar, 100 MW, withdrawn at Whirlwind Substation 230kV
- GOLDEN FIELDS SOLAR 3 Solar, 100 MW, withdrawn at Whirlwind Substation 230kV
- KEYHOLE WIND 2 Wind, 100 MW, withdrawn at Whirlwind Substation 230kV
- ROSE MEADOW WIND BANK Storage, 50 MW, withdrawn at Whirlwind Substation 230kV
- GOLDEN OASIS Solar, 33 MW, withdrawn at Whirlwind Substation 230kV
- GOLDEN PRISM Storage, 6 MW, withdrawn at Whirlwind Substation 230kV
Timeline
- Observed as built in CAISO.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources CAISO