Exact site not public
Map
WILLOW SPRINGS SOLAR 4 in California: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Willow Springs Solar 4
Storage
As filed: WILLOW SPRINGS SOLAR 4
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 1217
- Location
- KERN County, California (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage
- Connects at
- Whirlwind Substation 230kVConnection point1,700.6 MW active (7 of 45 projects).
At this site
3 records at WILLOW SPRINGS 2At this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | WILLOW SPRINGS 2 | Solar | 100 | Built |
| Co-located, other technology high confidence | WILLOW SPRINGS SOLAR 4 this record | Storage | 75 | Built |
| Co-located, other technology high confidence | WILLOW SPRINGS SOLAR 3 | Storage | 50 | Built |
Also at this interconnection point (42)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- EUISMOD Storage, 600 MW, contracted at Whirlwind Substation 230kV
- Willow Rock Energy Storage Center Storage, 500 MW, contracted at Whirlwind Substation 230kV
- ROSAMOND WEST SOLAR Solar + storage, 299.6 MW, contracted at Whirlwind Substation 230kV
- NORTH ROSAMOND SOLAR Solar + storage, 153 MW, contracted at Whirlwind Substation 230kV
- KEYHOLE WIND Wind, 100 MW, contracted at Whirlwind Substation 230kV
- Solar Star 3 Solar + storage, 24 MW, under construction at Whirlwind Substation 230kV
- Solar Star 4 Solar + storage, 24 MW, under construction at Whirlwind Substation 230kV
- AV SOLAR ONE PROJECT Solar, 250 MW, built at Whirlwind Substation 230kV
- WILLY 9 Solar + storage, 250 MW, built at Whirlwind Substation 230kV
- ANTELOPE VALLEY COMPLEX Solar + storage, 150 MW, built at Whirlwind Substation 230kV
- CATALINA SOLAR Solar, 145.4 MW, built at Whirlwind Substation 230kV
- PACIFIC WIND Wind, 141.3 MW, built at Whirlwind Substation 230kV
- TROPICO SOLAR Solar + storage, 110 MW, built at Whirlwind Substation 230kV
- ROSAMOND SOUTH EAST Solar + storage, 101.7 MW, built at Whirlwind Substation 230kV
- AVALON HYBRID Solar, 100 MW, built at Whirlwind Substation 230kV
- Camino Solar Hybrid Solar + storage, 54.3 MW, built at Whirlwind Substation 230kV
- CYCLONE SOLAR Solar + storage, 40 MW, built at Whirlwind Substation 230kV
- KINGBIRD SOLAR A (FKA AV SOLAR RANCH 2-A) Solar, 20 MW, built at Whirlwind Substation 230kV
- KINGBIRD SOLAR B (FKA AV SOLAR RANCH 2-B Solar, 20 MW, built at Whirlwind Substation 230kV
- ALTA 12 Wind, 1,150 MW, withdrawn at Whirlwind Substation 230kV
- ALTA Q175 (FKA ALTA 11) Wind, 650 MW, withdrawn at Whirlwind Substation 230kV
- METEORITE SOLAR Solar + storage, 400 MW, withdrawn at Whirlwind Substation 230kV
- VENADO VALLEY 1 Solar + storage, 300 MW, withdrawn at Whirlwind Substation 230kV
- RESONATE Solar + storage, 300 MW, withdrawn at Whirlwind Substation 230kV
- EON VISION WIND Wind, 277.6 MW, withdrawn at Whirlwind Substation 230kV
- GASKELL SOLAR GENERATING STATION Solar thermal, 264 MW, withdrawn at Whirlwind Substation 230kV
- BRIGHTSOURCE AV PROJECT Solar thermal, 260 MW, withdrawn at Whirlwind Substation 230kV
- ROSY 9 Solar, 250 MW, withdrawn at Whirlwind Substation 230kV
- ARROW Solar + storage, 250 MW, withdrawn at Whirlwind Substation 230kV
- DRACO SOLAR Solar + storage, 250 MW, withdrawn at Whirlwind Substation 230kV
- LINWOOD SOLAR FARM Solar + storage, 205.2 MW, withdrawn at Whirlwind Substation 230kV
- LONGSPUR 11 Solar + storage, 175 MW, withdrawn at Whirlwind Substation 230kV
- MOJAVALON I Solar, 146 MW, withdrawn at Whirlwind Substation 230kV
- FAIRMONT SOLAR GENERATING STATION Solar thermal, 141 MW, withdrawn at Whirlwind Substation 230kV
- DESERT VIEW SUNTOWER Solar, 141 MW, withdrawn at Whirlwind Substation 230kV
- ALTA Q153 (FKA ALTA 7) Wind, 100 MW, withdrawn at Whirlwind Substation 230kV
- WILLOW SOLAR Solar, 100 MW, withdrawn at Whirlwind Substation 230kV
- GOLDEN FIELDS SOLAR 3 Solar, 100 MW, withdrawn at Whirlwind Substation 230kV
- KEYHOLE WIND 2 Wind, 100 MW, withdrawn at Whirlwind Substation 230kV
- ROSE MEADOW WIND BANK Storage, 50 MW, withdrawn at Whirlwind Substation 230kV
- GOLDEN OASIS Solar, 33 MW, withdrawn at Whirlwind Substation 230kV
- GOLDEN PRISM Storage, 6 MW, withdrawn at Whirlwind Substation 230kV
Timeline
- Observed as built in CAISO.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources CAISO