Show on map

Exact site not public

Willow Springs Solar 4

Storage

As filed: WILLOW SPRINGS SOLAR 4

Capacity
Capacity: sourceCAISO · Open license, with creditMW
Location
KERN County, California (exact site not public)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Storage
Connects at
Whirlwind Substation 230kVConnection point1,700.6 MW active (7 of 45 projects).

At this site

3 records at WILLOW SPRINGS 2At this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing WILLOW SPRINGS 2 Solar 100 Built
Co-located, other technology high confidence WILLOW SPRINGS SOLAR 4 this record Storage 75 Built
Co-located, other technology high confidence WILLOW SPRINGS SOLAR 3 Storage 50 Built
Also at this interconnection point (42)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

Sources CAISO ยท EIA-860M

Sources

Attribution

Timeline

  • Observed as built in CAISO.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources CAISO

Sources

  • CAISOOpen license, with credit · retrieved Nov 17, 2026Source: California ISO

Every source and license · Attribution

View at source

Report a problem