Winchester Solar II, LLC
Solar + storage
Key facts
Solar + storage Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- Western Area Power Administration, Desert Southwest Region (WALC)
- In-service date
- (stated)
- Location
- Cochise County, Arizona
Sources
-
View at source →
EIA-860M · 2 records (70406-BA-2, 70406-PV-2)
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Units and requests (2)
How these combine
This project is one site. Each row is one unit or request a register lists for it: a generator in EIA-860M, a stage in NESO’s register, a request in a grid queue. Capacity is the live interconnection requests’ MW added up where there are any, plus any listed generator of a technology no request covers; otherwise the generators’ MW added up. The status is the most advanced any row reports; a withdrawn row ends the project only when no other row carries it on.
| Source | Record | Name | Technology | MW | Status | Proposed COD |
|---|---|---|---|---|---|---|
| EIA-860M Generator | 70406-BA-2 | Winchester Solar II, LLC | Storage | 87.8 | Under construction “(V) Under construction, more than 50 percent complete” | May 1, 2027 |
| EIA-860M Generator | 70406-PV-2 | Winchester Solar II, LLC | Solar | 87.8 | Under construction “(V) Under construction, more than 50 percent complete” | May 1, 2027 |