Winchester Solar II, LLC
Solar + storage
Key facts
Solar + storage Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- Western Area Power Administration, Desert Southwest Region (WALC)
- In-service date
- (stated)
- Location
- Cochise County, Arizona
Details
Who’s behind it
- Developer
- Torch Operating Company, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage
- Technology
- Solar + storage source: “Batteries + Solar Photovoltaic”
- Capacity (MW)
- 175.6 Capacity is the sum of the 2 generators listed under Sources.
- EIA plant
- 70406 2 generatorsEIA generatorsPlant 70406 BA-2, PV-2
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Winchester Solar I, LLC Under construction | Solar + storage | 1.5 mi | 175.6 |
| Apache Station Postponed | Gas, combustion turbine | 10.6 mi | 102.2 |
| THREE SISTERS Solar Generation and BESS Filed | Solar + storage | 12.7 mi | 600 |
Sources EIA-860M