Show on map
Winchester Solar II, LLCWinchester Solar I, LLC — Under construction · Solar + storage · AZ · 175.6 MW · 1.5 mi awayApache Station — Postponed · Gas, combustion turbine · AZ · 102.2 MW · 10.6 mi awayTHREE SISTERS Solar Generation and BESS — Filed · Solar + storage · AZ · 600 MW · 12.7 mi away
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Winchester Solar II, LLC

Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Western Area Power Administration, Desert Southwest Region (WALC)
In-service date
(stated)
Location
Cochise County, Arizona

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Storage
Technology
Solar + storage source: “Batteries + Solar Photovoltaic”
Capacity (MW)
175.6 Capacity is the sum of the 2 generators listed under Sources.
EIA plant
70406 2 generatorsEIA generatorsPlant 70406 BA-2, PV-2

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Winchester Solar I, LLC Under construction Solar + storage 1.5 mi 175.6
Apache Station Postponed Gas, combustion turbine 10.6 mi 102.2
THREE SISTERS Solar Generation and BESS Filed Solar + storage 12.7 mi 600

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution