Show on map
Yunfu power station 8Yunfu power station 7 — Under construction · Gas, combined cycle · 460 MW · 0.0 km awayGuangdong Xijiang power station Phase II Unit 3 — Announced · Coal · 660 MW · 23.8 km awayGuangdong Xijiang power station Phase II Unit 4 — Announced · Coal · 660 MW · 23.8 km away
  • Combustion
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Yunfu power station 8

Gas, combined cycle

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Guangdong, China

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Gas, combined cycle source: “oil/gas / combined cycle”

At this site

2 records at Yunfu power station 8At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Yunfu power station 8 this record Gas, combined cycle 460 Under construction
Another phase high confidence Yunfu power station 7 Gas, combined cycle 460 Under construction

Sources GEM

Sources

  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Observed as under construction in GEM (source status: “construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Yunfu power station 7 Under construction Gas, combined cycle 0.0 km 460
Guangdong Xijiang power station Phase II Unit 3 Announced Coal 23.8 km 660
Guangdong Xijiang power station Phase II Unit 4 Announced Coal 23.8 km 660

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution