Free email alerts →
Capacity (MW)
Status: active
Show projects that are

Always included while Built, Withdrawn, Status unknown or Postponed is ticked.

4 projects

Active only

What this view shows

Showing 4 active projects (announced to under construction). Hidden: 0 withdrawn or canceled.

Save this search as an alert Free, daily or weekly.

Projects matching the current filters, sorted by capacity, largest first by default.
Status Name. Sort by name, A to Z Technology Capacity (MW), sorted descending. Sort by capacity, smallest first Location Company Proposed online. Sort by proposed online date, latest first Source
Studied (source status: Active) CATHODE BESS Storage 150 MW Upton, TXCED Development Inc. Online Dec 31, 2027 ERCOT
Studied (source status: Active) ELECTRODE BESS Storage 150 MW Upton, TXCED Development Inc. Online Dec 31, 2027 ERCOT
Studied (source status: Active) Solara BESS 2 Storage 150 MW Jones, TXCED Development Inc. Online Nov 30, 2027 ERCOT
Studied (source status: Active) Solara BESS 1 Storage 150 MW Jones, TXCED Development Inc. Online Nov 30, 2027 ERCOT

Sources ERCOT

Sources

  • ERCOTTerms of use · retrieved Nov 4, 2026

Attribution