Kickstart Energy Storage I

Site of 2 records

Company Kickstart Infrastructure LLC

Lead filing
Kickstart Energy Storage I
Grouped by
the same grid connection point and developer
Active (MW)
2.9 across 2
Built (MW)
0 across 0
Withdrawn or canceled (MW)
0 across 0
EIA plant ID
—
Connects at
Tap 345 kV 1907 Venus Switch - 3383 BYNUM_5
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — Kickstart Energy Storage I Storage 1.4 Studied Kickstart Infrastructure LLC
Another phase high Kickstart Energy Storage II Storage 1.4 Studied Kickstart Infrastructure LLC

2. Also at this interconnection point

None recorded.

3. Sources

Sources ERCOT

Sources

  • ERCOTTerms of use · retrieved Nov 4, 2026