watermelon 5 energy storage

Site of 7 records

Company Tempus Power management LLC

Lead filing
watermelon 5 energy storage
Grouped by
the same grid connection point and developer
Active (MW)
714.7 across 7
Built (MW)
0 across 0
Withdrawn or canceled (MW)
0 across 0
EIA plant ID
—
Connects at
Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — watermelon 5 energy storage Storage 102.1 Studied Tempus Power management LLC
Another phase high watermelon 7 energy storage Storage 102.1 Studied Tempus Power management LLC
Another phase high watermelon 6 energy storage Storage 102.1 Studied Tempus Power management LLC
Another phase high watermelon 8 energy storage Storage 102.1 Studied Tempus Power management LLC
Another phase high watermelon 1 energy storage Storage 102.1 Studied Tempus Power management LLC
Another phase high watermelon 2 energy storage Storage 102.1 Studied Tempus Power management LLC
Another phase high watermelon 4 energy storage Storage 102.1 Studied Tempus Power management LLC

2. Also at this interconnection point

None recorded.

3. Sources

Sources ERCOT

Sources

  • ERCOTTerms of use · retrieved Nov 4, 2026

Attribution