Water Rock Solar 2

Site of 2 records

Company not recorded

Lead filing
WATER ROCK SOLAR 2
Grouped by
the same grid connection point and project name
Active (MW)
700 across 2
Built (MW)
0 across 0
Withdrawn or canceled (MW)
0 across 0
EIA plant ID
—
Connects at
Gamebird Substation 230 kV
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — WATER ROCK SOLAR 2 Solar + storage 500 Studied —
Another phase high WATER ROCK SOLAR 1 Solar + storage 200 Contracted —

2. Also at this interconnection point

3 other requests at the same grid connection point

From another or no named developer: they share the connection, not the site.

Other requests at this site's grid connection points, active first, each by capacity, with the company that filed it.
NameCompanyTechnologyMWStatusConnects at
ARES NEVADA — Storage 44 Contracted Gamebird Substation 230 kV
COPPER RAYS — Solar 714 Withdrawn Gamebird Substation 230 kV
RE PRISM — Solar 205 Withdrawn Gamebird Substation 230 kV

3. Sources

Sources CAISO