WATER ROCK SOLAR 1 in Nevada: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Water Rock Solar 1
Solar + storage
As filed: WATER ROCK SOLAR 1
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 1801
- In-service date
- (stated)
- Location
- NYE County, Nevada (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Connects at
- Gamebird Substation 230 kVConnection point744 MW active (3 of 5 projects).
At this site
2 records at WATER ROCK SOLAR 2At this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | WATER ROCK SOLAR 2 | Solar + storage | 500 | Studied |
| Another phase high confidence | WATER ROCK SOLAR 1 this record | Solar + storage | 200 | Contracted |
Also at this interconnection point (3)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- ARES NEVADA Storage, 44 MW, contracted at Gamebird Substation 230 kV
- COPPER RAYS Solar, 714 MW, withdrawn at Gamebird Substation 230 kV
- RE PRISM Solar, 205 MW, withdrawn at Gamebird Substation 230 kV
Sources CAISO
Timeline
- Stated In-service date stated by CAISO.
- Observed as contracted in CAISO.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.