Lotus Solar Farm

Site of 2 records

Company not recorded

Lead filing
LOTUS SOLAR FARM
Grouped by
the same grid connection point and project name
Active (MW)
0 across 0
Built (MW)
50 across 1
Withdrawn or canceled (MW)
102 across 1
EIA plant ID
—
Connects at
Borden Substation 70kV
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — LOTUS SOLAR FARM Solar 50 Built —
Another phase medium LOTUS 2 SOLAR FARM Solar + storage 102 Withdrawn —

2. Also at this interconnection point

4 other requests at the same grid connection point

From another or no named developer: they share the connection, not the site.

Other requests at this site's grid connection points, active first, each by capacity, with the company that filed it.
NameCompanyTechnologyMWStatusConnects at
FOXGLOVE HYBRID SOLAR — Solar + storage 100 Withdrawn Borden Substation 70kV
MADERA SOLAR — Solar 60 Withdrawn Borden Substation 70kV
HOBBS ENERGY STORAGE — Storage 50.5 Withdrawn Borden Substation 70kV
Kingston Energy Storage, LLC Enel Green Power NA, Inc. Storage 50 Withdrawn Borden Substation 70kV