Exact site not public
Map
LOTUS SOLAR FARM in California: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Lotus Solar Farm
Solar
As filed: LOTUS SOLAR FARM
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Location
- MADERA County, California (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Connects at
- Borden Substation 70kVConnection point0 MW active (0 of 6 projects).
At this site
2 records at LOTUS SOLAR FARMAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | LOTUS SOLAR FARM this record | Solar | 50 | Built |
| Another phase medium confidence | LOTUS 2 SOLAR FARM | Solar + storage | 102 | Withdrawn |
Also at this interconnection point (4)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- FOXGLOVE HYBRID SOLAR Solar + storage, 100 MW, withdrawn at Borden Substation 70kV
- MADERA SOLAR Solar, 60 MW, withdrawn at Borden Substation 70kV
- HOBBS ENERGY STORAGE Storage, 50.5 MW, withdrawn at Borden Substation 70kV
- Kingston Energy Storage, LLC Storage, 50 MW, withdrawn at Borden Substation 70kV
Timeline
- Observed as built in CAISO.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources CAISO