Mesquite Solar 1 (FKA Mesquite Generation)

Site of 4 records

Company not recorded

Lead filing
MESQUITE SOLAR 1 (FKA MESQUITE GENERATION)
Grouped by
the same grid connection point and project name
Active (MW)
0 across 0
Built (MW)
470.3 across 4
Withdrawn or canceled (MW)
0 across 0
EIA plant ID
—
Connects at
Hassayampa Common Bus 500 kV
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — MESQUITE SOLAR 1 (FKA MESQUITE GENERATION) Solar 165 Built —
Another phase high MESQUITE SOLAR 3 Solar 152 Built —
Another phase high MESQUITE SOLAR 2 Solar 100.8 Built —
Another phase high MESQUITE SOLAR 4 Solar + storage 52.5 Built —

2. Also at this interconnection point

7 other requests at the same grid connection point

From another or no named developer: they share the connection, not the site.

Other requests at this site's grid connection points, active first, each by capacity, with the company that filed it.
NameCompanyTechnologyMWStatusConnects at
VULCAN — Solar + storage 250 Studied Hassayampa Common Bus 500 kV
SUN STREAMS SOLAR 2 — Solar 150 Built Hassayampa Common Bus 500 kV
ARLINGTON VALLEY SOLAR ENERGY 2 — Solar 127 Built Hassayampa Common Bus 500 kV
SADDLE MOUNTAIN SOLAR — Solar 125 Built Hassayampa Common Bus 500 kV
SUN STREAMS 5 — Solar + storage 450 Withdrawn Hassayampa Common Bus 500 kV
VULCAN 2 — Solar + storage 250 Withdrawn Hassayampa Common Bus 500 kV
SUN STREAMS 4 — Solar + storage 215 Withdrawn Hassayampa Common Bus 500 kV

3. Sources

Sources CAISO

Sources

Attribution