Madera Solar PV I (FKA Wheeler Ridge Solar PV1)

Site of 3 records

Company not recorded

Lead filing
MADERA SOLAR PV I (FKA WHEELER RIDGE SOLAR PV1)
Grouped by
the same grid connection point and project name
Active (MW)
0 across 0
Built (MW)
0 across 0
Withdrawn or canceled (MW)
497 across 3
EIA plant ID
—
Connects at
Borden 230 kV
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — MADERA SOLAR PV I (FKA WHEELER RIDGE SOLAR PV1) Solar 220 Withdrawn —
Co-located, other technology high MADERA ENERGY CENTER Gas, combined cycle 210 Withdrawn —
Co-located, other technology high MADERA ENERGY CENTER EXPANSION Gas, combined cycle 67 Withdrawn —

2. Also at this interconnection point

5 other requests at the same grid connection point

From another or no named developer: they share the connection, not the site.

Other requests at this site's grid connection points, active first, each by capacity, with the company that filed it.
NameCompanyTechnologyMWStatusConnects at
LOTUS SOLAR 2 — Solar + storage 200 Studied Borden 230 kV
PERSEUS SOLAR — Solar 206.4 Withdrawn Borden 230 kV
PUMA STORAGE — Storage 200 Withdrawn Borden 230 kV
TRIGO — Solar + storage 150 Withdrawn Borden 230 kV
LOWLANDS P3 — Gas, combustion turbine 126.5 Withdrawn Borden 230 kV

3. Sources

Sources CAISO

Sources

Attribution