Blue Energy Center - Phase 3 – Steam Stage 2

Site of 2 records

Company Sister 1, LLC

Lead filing
Blue Energy Center - Phase 3 – Steam Stage 2
Grouped by
the same grid connection point and developer
Active (MW)
1,795 across 2
Built (MW)
0 across 0
Withdrawn or canceled (MW)
0 across 0
EIA plant ID
—
Connects at
Tap 345kV 80286 DULCE7A - 8676 STATIC7A
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — Blue Energy Center - Phase 3 – Steam Stage 2 Nuclear 1,320 Studied Sister 1, LLC
Co-located, other technology high Blue Energy Center - Phase 2b – Steam Gas, steam turbine 475 Studied Sister 1, LLC

2. Also at this interconnection point

2 other requests at the same grid connection point

From another or no named developer: they share the connection, not the site.

Other requests at this site's grid connection points, active first, each by capacity, with the company that filed it.
NameCompanyTechnologyMWStatusConnects at
Blue Energy Center- Phase 1a - Gas Brother 1, LLC Gas, combustion turbine 780 Studied Tap 345kV 80286 DULCE7A - 8676 STATIC7A
Blue Energy Center - Phase 1b – Steam Brother 1, LLC Gas, combined cycle 330 Studied Tap 345kV 80286 DULCE7A - 8676 STATIC7A