Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned6510.30
Under construction1<0.10
Operating5915.20
Idling or retired204.20

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

Sites hidden

  1. Jim Bridger36%2,326MWPlant · Gas, steam turbine · Sweetwater, WY · since 1974 · PacifiCorp
  2. Colstrip56%1,647.4MWPlant · Coal · Rosebud, MT · since 1984 · Talen Montana LLC
  3. Hunter51%1,472.2MWPlant · Coal · Emery, UT · since 1978 · PacifiCorp
  4. Craig (CO)22%1,427.6MWPlant · Coal · Moffat, CO · Retiring 2026 · Tri-State G & T Assn, Inc
  5. Lake Side Power Plant58%1,246.5MWPlant · Gas, combined cycle · Utah, UT · since 2007 · PacifiCorp
  6. Huntington51%1,015.5MWPlant · Coal · Emery, UT · since 1974 · PacifiCorp
  7. Dave Johnston36%816.7MWPlant · Coal · Converse, WY · since 1959 · PacifiCorp
  8. Naughton33%707.2MWPlant · Coal · Lincoln, WY · since 1963 · PacifiCorp
  9. Hermiston Generating Plant54%621.2MWPlant · Gas, combined cycle · Umatilla, OR · since 1996 · Hermiston Generating Co LP
  10. PacifiCorp—600MWProject · Gas, other · Sweetwater, WY · due Dec 2030 · PacifiCorp
  11. PacifiCorp—600MWProject · Gas, other · Sweetwater, WY · due Dec 2030 · PacifiCorp
  12. PacifiCorp—599.7MWProject · Gas, other · Converse, WY · due Jun 2029 · PacifiCorp
  13. Chehalis Generating Facility50%593.3MWPlant · Gas, combined cycle · Lewis, WA · Retiring 2043 · PacifiCorp
  14. Rock Creek Wind12%590MWPlant · Wind · Carbon, WY · since 2025 · PacifiCorp
  15. Currant Creek52%566.9MWPlant · Gas, combined cycle · Juab, UT · since 2005 · PacifiCorp
  16. TB Flats33%503.2MWPlant · Wind · Carbon, WY · since 2021 · PacifiCorp
  17. PacifiCorp—500MWProject · Nuclear · Box Elder, UT · due Dec 2030 · PacifiCorp
  18. Hayden—465.4MWPlant · Coal · Routt, CO · Retiring 2027 · Public Service Co of Colorado
  19. Gadsby5%432.8MWPlant · Gas, steam turbine · Salt Lake, UT · since 1951 · PacifiCorp
  20. PacifiCorp—400MWProject · Wind · Carbon, WY · due Dec 2027 · PacifiCorp
  21. PacifiCorp—399.8MWProject · Solar + storage · Morrow, OR · due Dec 2028 · PacifiCorp
  22. PacifiCorp—399.8MWProject · Solar + storage · Morrow, OR · due Dec 2028 · PacifiCorp
  23. PacifiCorp—399.8MWProject · Solar + storage · Morrow, OR · due Dec 2028 · PacifiCorp
  24. PacifiCorp—399.8MWProject · Solar + storage · Morrow, OR · due Dec 2028 · PacifiCorp
  25. PacifiCorp—398MWProject · Solar + storage · Bingham, ID · due Dec 2028 · PacifiCorp
  26. PacifiCorp—363.2MWProject · Gas, other · Juab, UT · due Jun 2029 · PacifiCorp
  27. Wyodak60%362.1MWPlant · Coal · Campbell, WY · since 1978 · PacifiCorp
  28. Ekola Flats37%250.9MWPlant · Wind · Carbon, WY · since 2020 · PacifiCorp
  29. PacifiCorp—250MWProject · Solar · Carbon, WY · due Jan 2026 · PacifiCorp
  30. PacifiCorp—250MWProject · Solar · Carbon, WY · due Jan 2026 · PacifiCorp
  31. Swift 125%240MWPlant · Hydro · Skamania, WA · since 1958 · PacifiCorp
  32. PacifiCorp—240MWProject · Solar · Carbon, WY · due Jan 2026 · PacifiCorp
  33. Pryor Mountain Wind34%239.8MWPlant · Wind · Carbon, MT · since 2021 · PacifiCorp
  34. PacifiCorp—237MWProject · Solar · Converse, WY · due Jan 2026 · PacifiCorp
  35. Marengo Wind Plant30%234MWPlant · Wind · Columbia, WA · since 2007 · PacifiCorp
  36. PacifiCorp—206MWProject · Wind · Bingham, ID · due Dec 2026 · PacifiCorp
  37. PacifiCorp—204.6MWProject · Solar + storage · Jefferson, OR · due Dec 2028 · PacifiCorp
  38. Cedar Springs II42%200MWPlant · Wind · Converse, WY · since 2020 · PacifiCorp
  39. PacifiCorp—199.9MWProject · Gas, other · Juab, UT · due Dec 2026 · PacifiCorp
  40. PacifiCorp—199.9MWProject · Storage · Klamath, OR · due Dec 2026 · PacifiCorp
  41. PacifiCorp—199.9MWProject · Gas, other · Juab, UT · due Dec 2026 · PacifiCorp
  42. PacifiCorp—199.9MWProject · Storage · Crook, OR · due Dec 2029 · PacifiCorp
  43. PacifiCorp—199.9MWProject · Storage · Lake, OR · due Dec 2029 · PacifiCorp
  44. PacifiCorp—199.9MWProject · Gas, other · Juab, UT · due Dec 2026 · PacifiCorp
  45. PacifiCorp—199.9MWProject · Storage · Klamath, OR · due Dec 2026 · PacifiCorp
  46. PacifiCorp—199.9MWProject · Gas, other · Juab, UT · due Dec 2026 · PacifiCorp
  47. PacifiCorp—199.9MWProject · Storage · Crook, OR · due Dec 2028 · PacifiCorp
  48. PacifiCorp—199.9MWProject · Storage · Lake, OR · due Dec 2028 · PacifiCorp
  49. PacifiCorp—199.9MWProject · Solar + storage · Morrow, OR · due Dec 2030 · PacifiCorp
  50. PacifiCorp—178MWProject · Solar · Emery, UT · due Jan 2026 · PacifiCorp
All records in view, sorted by MW, descending
Jim BridgerPlantOperating2,326MW36%1974EIA-860M
ColstripPlantOperating1,647.4MW56%1984EIA-860M
HunterPlantOperating1,472.2MW51%1978EIA-860M
Craig (CO)PlantRetiring1,427.6MW22%Retiring 2026EIA-860M
Lake Side Power PlantPlantOperating1,246.5MW58%2007EIA-860M
HuntingtonPlantOperating1,015.5MW51%1974EIA-860M
Dave JohnstonPlantOperating816.7MW36%1959EIA-860M
NaughtonPlantOperating707.2MW33%1963EIA-860M
Hermiston Generating PlantPlantOperating621.2MW54%1996EIA-860M
PacifiCorpProjectPlanned600MW—Dec 2030Berkeley Lab
PacifiCorpProjectPlanned600MW—Dec 2030Berkeley Lab
PacifiCorpProjectPlanned599.7MW—Jun 2029Berkeley Lab
Chehalis Generating FacilityPlantRetiring593.3MW50%Retiring 2043EIA-860M
Rock Creek WindPlantOperating590MW12%2025EIA-860M
Currant CreekPlantOperating566.9MW52%2005EIA-860M
TB FlatsPlantOperating503.2MW33%2021EIA-860M
PacifiCorpProjectPlanned500MW—Dec 2030Berkeley Lab
HaydenPlantRetiring465.4MW—Retiring 2027EIA-860M
GadsbyPlantOperating432.8MW5%1951EIA-860M
PacifiCorpProjectPlanned400MW—Dec 2027Berkeley Lab
PacifiCorpProjectPlanned399.8MW—Dec 2028Berkeley Lab
PacifiCorpProjectPlanned399.8MW—Dec 2028Berkeley Lab
PacifiCorpProjectPlanned399.8MW—Dec 2028Berkeley Lab
PacifiCorpProjectPlanned399.8MW—Dec 2028Berkeley Lab
PacifiCorpProjectPlanned398MW—Dec 2028Berkeley Lab
PacifiCorpProjectPlanned363.2MW—Jun 2029Berkeley Lab
WyodakPlantOperating362.1MW60%1978EIA-860M
Ekola FlatsPlantOperating250.9MW37%2020EIA-860M
PacifiCorpProjectPlanned250MW—Jan 2026Berkeley Lab
PacifiCorpProjectPlanned250MW—Jan 2026Berkeley Lab
Swift 1PlantOperating240MW25%1958EIA-860M
PacifiCorpProjectPlanned240MW—Jan 2026Berkeley Lab
Pryor Mountain WindPlantOperating239.8MW34%2021EIA-860M
PacifiCorpProjectPlanned237MW—Jan 2026Berkeley Lab
Marengo Wind PlantPlantOperating234MW30%2007EIA-860M
PacifiCorpProjectPlanned206MW—Dec 2026Berkeley Lab
PacifiCorpProjectPlanned204.6MW—Dec 2028Berkeley Lab
Cedar Springs IIPlantOperating200MW42%2020EIA-860M
PacifiCorpProjectPlanned199.9MW—Dec 2026Berkeley Lab
PacifiCorpProjectPlanned199.9MW—Dec 2026Berkeley Lab
PacifiCorpProjectPlanned199.9MW—Dec 2026Berkeley Lab
PacifiCorpProjectPlanned199.9MW—Dec 2029Berkeley Lab
PacifiCorpProjectPlanned199.9MW—Dec 2029Berkeley Lab
PacifiCorpProjectPlanned199.9MW—Dec 2026Berkeley Lab
PacifiCorpProjectPlanned199.9MW—Dec 2026Berkeley Lab
PacifiCorpProjectPlanned199.9MW—Dec 2026Berkeley Lab
PacifiCorpProjectPlanned199.9MW—Dec 2028Berkeley Lab
PacifiCorpProjectPlanned199.9MW—Dec 2028Berkeley Lab
PacifiCorpProjectPlanned199.9MW—Dec 2030Berkeley Lab
PacifiCorpProjectPlanned178MW—Jan 2026Berkeley Lab

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions