Hunter
Power plant · Coal
Key facts
Power plant · Coalran 53% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1978
- Net generation, 2025
- 6,833,658 MWh
- Grid
- 345 kV to PacifiCorp (PACE)
- Location
- Emery County, Utah
- Operated by
- PacifiCorp
Output
- Coal
- Oil
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Coal source: “Conventional Steam Coal”
- Age
- 48 years since 1978
- Unused energy
- 6,063 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 10,665 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 72,879,716 |
| Capacity factor, 2025 | 0.530 |
| Heat rate (Btu/kWh), 2025 | 10,664.8 |
| Net generation (MWh), 2025 | 6,833,658.0 |
| Balancing authority code | PACE |
Ownership
8 companies9| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| PacifiCorp | Operator | EIA-860M | ||
| BERKSHIRE HATHAWAY INC | Owner | 84.7% | 31 Dec 2023 | EPA GHGRP |
| DESERET GENERATION & TRANSMISSION COOPERATIVE | Owner | 8.4% | 31 Dec 2023 | EPA GHGRP |
| UTAH ASSOCIATED MUNICIPAL POWER SYSTEMS | Owner | 4.9% | 31 Dec 2023 | EPA GHGRP |
| Utah Municipal Power Agency | Owner | 2.1% | 31 Dec 2023 | EPA GHGRP |
| PacifiCorp | Owner | 51.1% | 31 Dec 2025 | EIA-860 |
| Provo City Corp | Owner | 2.1% | 31 Dec 2025 | EIA-860 |
| Deseret Generation & Tran Coop | Owner | 8.3% | 31 Dec 2025 | EIA-860 |
| Utah Associated Mun Power Sys | Owner | 4.8% | 31 Dec 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Hornshadow Solar, LLC Postponed | Storage | 4.5 km | 25 |
| Hornshadow Solar II, LLC Postponed | Storage | 4.5 km | 50 |
| Joes Valley Dam Postponed | Hydro | 24.0 km | 3.4 |