Chehalis Generating Facility

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 45% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
2,337,422 MWh
Grid
500 kV to Bonneville Power Administration (BPAT)
Location
Lewis County, Washington
Operated by
PacifiCorp

Output

Net generation MWh by year, 2003 to 2026
Fuel burned MMBtu by year, 2003 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
23 years since 2003
Heat rate
7,595 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Berkshire Hathaway Inc
Share pct
100
Gem entity id
E100000001155
Unit ids
G100000401963
Location id
L100000402185
Eia plant ids
55662
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110055650371
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000144
Fuel burned (MMBtu), 202517,752,433
Capacity factor, 20250.450
Heat rate (Btu/kWh), 20257,594.9
Net generation (MWh), 20252,337,422
Balancing authority codeBPAT

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2043
Capacity scheduled to retire
593.3 MW
Generators scheduled to retire
3
Share of in-service capacity scheduled
100%
Capacity still in service
593.3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
CANatural Gas Fired Combined Cycle195.5 MWScheduled to retireDecember 2043
CT1Natural Gas Fired Combined Cycle198.9 MWScheduled to retireDecember 2043
CT2Natural Gas Fired Combined Cycle198.9 MWScheduled to retireDecember 2043

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
500 kV
Transmission or distribution system owner
Bonneville Power Administration
Balancing authority
Bonneville Power Administration
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
PacifiCorp Operator EIA-860M
BERKSHIRE HATHAWAY INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units CA, CT1, CT2 scheduled to retire, 593.3 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Centralia Battery Energy Storage System Filed Storage 17.6 km 200
Tono Solar Postponed Solar 18.0 km 80

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026