Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned000
Under construction30.20
Operating301.60
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

Sites hidden

  1. Wimauma Solar and Battery Storage14%114.8MWPlant · Solar · Hillsborough, FL · since 2020 · Tampa Electric Co
  2. Lake Mabel Solar and Battery Storage13%114.5MWPlant · Solar · Polk, FL · since 2023 · Tampa Electric Co
  3. Long Branch Solar—74.9MWPlant · Solar · Manatee, FL · since 2026 · Tampa Electric Co
  4. Lithia Solar22%74.5MWPlant · Solar · Hillsborough, FL · since 2019 · Tampa Electric Co
  5. Little Manatee River Solar21%74.5MWPlant · Solar · Hillsborough, FL · since 2020 · Tampa Electric Co
  6. Jamison Solar (FL)21%74.5MWPlant · Solar · Polk, FL · since 2022 · Tampa Electric Co
  7. Magnolia Solar22%74.5MWPlant · Solar · Polk, FL · since 2021 · Tampa Electric Co
  8. Bullfrog Creek Solar25%74.5MWPlant · Solar · Hillsborough, FL · since 2024 · Tampa Electric Co
  9. Cottonmouth Ranch Solar—74.5MWPlant · Solar · Hillsborough, FL · since 2025 · Tampa Electric Co
  10. Keene Branch Solar—74.5MWProject · Solar · Hillsborough, FL · due Dec 2026 · Tampa Electric Co
  11. Balm Solar20%74.4MWPlant · Solar · Hillsborough, FL · since 2018 · Tampa Electric Co
  12. Payne Creek Solar20%70.3MWPlant · Solar · Polk, FL · since 2018 · Tampa Electric Co
  13. Juniper Solar (FL)23%70MWPlant · Solar · Pasco, FL · since 2023 · Tampa Electric Co
  14. Laurel Oaks Solar23%61.2MWPlant · Solar · Hillsborough, FL · since 2022 · Tampa Electric Co
  15. Grange Hall Solar22%61.1MWPlant · Solar · Hillsborough, FL · since 2019 · Tampa Electric Co
  16. Alafia Solar23%60MWPlant · Solar · Polk, FL · since 2023 · Tampa Electric Co
  17. Durrance20%60MWPlant · Solar · Polk, FL · since 2021 · Tampa Electric Co
  18. Peace Creek Solar20%55.4MWPlant · Solar · Polk, FL · since 2019 · Tampa Electric Co
  19. Riverside Solar24%55.2MWPlant · Solar · Hillsborough, FL · since 2022 · Tampa Electric Co
  20. Mountain View Solar (FL)21%54.6MWPlant · Solar · Pasco, FL · since 2022 · Tampa Electric Co
  21. Mattaniah Solar—52MWProject · Solar · Polk, FL · due Dec 2026 · Tampa Electric Co
  22. Lake Hancock Solar21%49.5MWPlant · Solar · Polk, FL · since 2019 · Tampa Electric Co
  23. Big Bend II Solar22%45.8MWPlant · Solar · Hillsborough, FL · since 2022 · Tampa Electric Co
  24. Dover Solar and Battery Storage13%40MWPlant · Solar · Hillsborough, FL · since 2023 · Tampa Electric Co
  25. Brewster Solar—40MWProject · Solar · Polk, FL · due Dec 2026 · Tampa Electric Co
  26. Bonnie Mine Solar21%37.5MWPlant · Solar · Polk, FL · since 2019 · Tampa Electric Co
  27. Big Bend 1 Solar and Battery Storage—32.4MWPlant · Solar · Hillsborough, FL · since 2017 · Tampa Electric Co
  28. English Creek Solar26%23MWPlant · Solar · Hillsborough, FL · since 2024 · Tampa Electric Co
  29. Saint Lucy solar farm—10MWPlant · Solar · Barbados · since 2016
  30. TIA Solar21%1.6MWPlant · Solar · Hillsborough, FL · since 2015 · Tampa Electric Co
  31. Legoland Solar14%1.4MWPlant · Solar · Polk, FL · since 2016 · Tampa Electric Co
  32. Big Bend Agrivoltaics2%1MWPlant · Solar · Hillsborough, FL · since 2022 · Tampa Electric Co
  33. Big Bend Floating Solar I—1MWPlant · Solar · Hillsborough, FL · since 2022 · Tampa Electric Co
All records in view, sorted by MW, descending
Wimauma Solar and Battery StoragePlantOperating114.8MW14%2020EIA-860M
Lake Mabel Solar and Battery StoragePlantOperating114.5MW13%2023EIA-860M
Long Branch SolarPlantOperating74.9MW—2026EIA-860M
Lithia SolarPlantOperating74.5MW22%2019EIA-860M
Little Manatee River SolarPlantOperating74.5MW21%2020EIA-860M
Jamison Solar (FL)PlantOperating74.5MW21%2022EIA-860M
Magnolia SolarPlantOperating74.5MW22%2021EIA-860M
Bullfrog Creek SolarPlantOperating74.5MW25%2024EIA-860M
Cottonmouth Ranch SolarPlantOperating74.5MW—2025EIA-860M
Keene Branch SolarProjectUnder construction74.5MW—Dec 2026EIA-860M
Balm SolarPlantOperating74.4MW20%2018EIA-860M
Payne Creek SolarPlantOperating70.3MW20%2018EIA-860M
Juniper Solar (FL)PlantOperating70MW23%2023EIA-860M
Laurel Oaks SolarPlantOperating61.2MW23%2022EIA-860M
Grange Hall SolarPlantOperating61.1MW22%2019EIA-860M
Alafia SolarPlantOperating60MW23%2023EIA-860M
DurrancePlantOperating60MW20%2021EIA-860M
Peace Creek SolarPlantOperating55.4MW20%2019EIA-860M
Riverside SolarPlantOperating55.2MW24%2022EIA-860M
Mountain View Solar (FL)PlantOperating54.6MW21%2022EIA-860M
Mattaniah SolarProjectUnder construction52MW—Dec 2026EIA-860M
Lake Hancock SolarPlantOperating49.5MW21%2019EIA-860M
Big Bend II SolarPlantOperating45.8MW22%2022EIA-860M
Dover Solar and Battery StoragePlantOperating40MW13%2023EIA-860M
Brewster SolarProjectUnder construction40MW—Dec 2026EIA-860M
Bonnie Mine SolarPlantOperating37.5MW21%2019EIA-860M
Big Bend 1 Solar and Battery StoragePlantOperating32.4MW—2017EIA-860M
English Creek SolarPlantOperating23MW26%2024EIA-860M
Saint Lucy solar farmPlantOperating10MW——2016GEM
TIA SolarPlantOperating1.6MW21%2015EIA-860M
Legoland SolarPlantOperating1.4MW14%2016EIA-860M
Big Bend AgrivoltaicsPlantOperating1MW2%2022EIA-860M
Big Bend Floating Solar IPlantOperating1MW—2022EIA-860M

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions