Show on map
Riverside Solar — Power plant · Solar · Tampa Electric CoBig Bend III Battery Storage — Permitted · Storage · FL · 75 MW · 8.8 mi awayTampa Electric Co NA 3 — Postponed · Gas, combustion turbine · FL · 99 MW · 9.0 mi awaySouth Tampa Energy Storage — Postponed · Storage · FL · 20 MW · 12.7 mi awayKeene Branch Solar — Under construction · Solar · FL · 74.5 MW · 12.8 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Riverside Solar

Power plant · Solar

Key facts

Power plant · Solarran 22% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
108,650 MWh
Grid
69 kV to Tampa Electric Co (TEC)
Location
Hillsborough County, Florida
Operated by
Tampa Electric CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000838901
Location id
L100000833218
Eia plant ids
65687
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
69
Transmission owner
Tampa Electric Co
Balancing authority code
TEC
Balancing authority name
Tampa Electric Company
Fuel burned (MMBtu), 2025370,714
Capacity factor, 20250.225
Net generation (MWh), 2025108,650
Balancing authority codeTEC

Solar arrays

Array area (acres)
182.1
AC capacity (MW)
55
DC capacity (MW)
66.8
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2023

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Big Bend III Battery Storage Permitted Storage 8.8 mi 75
Tampa Electric Co NA 3 Postponed Gas, combustion turbine 9.0 mi 99
South Tampa Energy Storage Postponed Storage 12.7 mi 20
Keene Branch Solar Under construction Solar 12.8 mi 74.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution