Show on map
Big Bend 1 Solar and Battery Storage — Power plant · Solar · Tampa Electric CoTampa Electric Co NA 3 — Postponed · Gas, combustion turbine · FL · 99 MW · 1.2 mi awayBig Bend III Battery Storage — Permitted · Storage · FL · 75 MW · 1.3 mi awayH L Culbreath Bayside Power Station — Postponed · Gas, combustion turbine · FL · 503.8 MW · 8.7 mi awayTampa Electric Co NA 2 — Postponed · Gas, combustion turbine · FL · 982 MW · 8.7 mi awaySouth Tampa Energy Storage — Postponed · Storage · FL · 20 MW · 9.6 mi awayKeene Branch Solar — Under construction · Solar · FL · 74.5 MW · 11.4 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Big Bend 1 Solar and Battery Storage

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Grid
69 kV to Tampa Electric Co (TEC)
Location
Hillsborough County, Florida
Operated by
Tampa Electric CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
9 years since 2017
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
69
Transmission owner
Tampa Electric Co
Balancing authority code
TEC
Balancing authority name
Tampa Electric Company
Fuel burned (MMBtu), 20257,639
Capacity factor, 20250.008
Net generation (MWh), 20252,223
Balancing authority codeTEC

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Tampa Electric Co NA 3 Postponed Gas, combustion turbine 1.2 mi 99
Big Bend III Battery Storage Permitted Storage 1.3 mi 75
H L Culbreath Bayside Power Station Postponed Gas, combustion turbine 8.7 mi 503.8
Tampa Electric Co NA 2 Postponed Gas, combustion turbine 8.7 mi 982
South Tampa Energy Storage Postponed Storage 9.6 mi 20
Keene Branch Solar Under construction Solar 11.4 mi 74.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution