Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned319.01
Under construction151.40
Operating17050.30
Idling or retired102.80

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

Sites hidden

  1. West County Energy Center49%4,263MWPlant · Gas, combined cycle · Palm Beach, FL · since 2009 · Florida Power & Light Co
  2. Turkey Point76%2,978.4MWPlant · Nuclear · Miami Dade, FL · since 1972 · Florida Power & Light Co
  3. Manatee28%2,951.2MWPlant · Gas, steam turbine · Manatee, FL · since 1976 · Florida Power & Light Co
  4. Fort Myers40%2,680.9MWPlant · Gas, combined cycle · Lee, FL · since 1958 · Florida Power & Light Co
  5. Scherer37%2,673MWPlant · Coal · Monroe, GA · since 1982 · Georgia Power Co
  6. Martin40%2,448.5MWPlant · Gas, combined cycle · Martin, FL · since 1994 · Florida Power & Light Co
  7. Sanford46%2,377.8MWPlant · Gas, combined cycle · Volusia, FL · since 1969 · Florida Power & Light Co
  8. Victor J Daniel Jr54%2,229MWPlant · Gas, combined cycle · Jackson, MS · since 1977 · Mississippi Power Co
  9. St Lucie81%2,160MWPlant · Nuclear · St Lucie, FL · since 1976 · Florida Power & Light Co
  10. Gulf Clean Energy Center10%2,107.5MWPlant · Gas, steam turbine · Escambia, FL · since 1959 · Florida Power & Light Co
  11. Okeechobee Clean Energy Center68%1,723.1MWPlant · Gas, combined cycle · Okeechobee, FL · since 2019 · Florida Power & Light Co
  12. Dania Beach 755%1,447.7MWPlant · Gas, combined cycle · Broward, FL · since 2022 · Florida Power & Light Co
  13. Port Everglades44%1,352MWPlant · Gas, combined cycle · Broward, FL · since 2016 · Florida Power & Light Co
  14. Cape Canaveral65%1,295MWPlant · Gas, combined cycle · Brevard, FL · since 2013 · Florida Power & Light Co
  15. Riviera67%1,295MWPlant · Gas, combined cycle · Palm Beach, FL · since 2014 · Florida Power & Light Co
  16. Lauderdale3%1,215.9MWPlant · Gas, combustion turbine · Broward, FL · since 1970 · Florida Power & Light Co
  17. Oleander Power Project LP7%994.4MWPlant · Gas, combustion turbine · Brevard, FL · since 2002 · Oleander Holdings LLC
  18. William F Wyman Hybrid2%862.7MWPlant · Oil · Cumberland, ME · since 1957 · FPL Energy Wyman LLC
  19. Curtis H Stanton Energy Center56%688.3MWPlant · Gas, combined cycle · Orange, FL · since 2003 · Stanton Clean Energy LLC
  20. Lansing Smith66%661.5MWPlant · Gas, combined cycle · Bay, FL · since 1971 · Florida Power & Light Co
  21. NextEra Energy Resources Interconnection Holdings, LLC—600MWProject · Solar + storage · Power, ID · due Oct 2030 · NextEra Energy Resources Interconnection Holdings, LLC
  22. Trumpet Solar—533MWProject · Solar · Reeves, TX · due Jul 2030 · NextEra Energy Resources Interconnection Holdings, LLC
  23. Half Moon Solar—512.5MWProject · Solar · Starr, TX · due Jul 2029 · NextEra Energy Interconnection Holdings, LLC
  24. Manatee Solar Energy Center—483.5MWPlant · Storage · Manatee, FL · since 2016 · Florida Power & Light Co
  25. Capshaw Solar—450MWProject · Solar · Reeves, TX · due Jul 2030 · NextEra Energy Resources Interconnection Holdings, LLC
  26. ZSS Solar—450MWProject · Solar · Knox, TX · due Dec 2027 · NextEra Energy Resources - ERCOT
  27. Silverton Solar—410MWProject · Solar · Briscoe, TX · due Jul 2029 · NextEra Energy Interconnection Holdings, LLC
  28. Bellingham Cogeneration Facility9%386.1MWPlant · Gas, combined cycle · Norfolk, MA · since 1991 · Northeast Energy Associates LP
  29. Skyrider Wind—370MWProject · Wind · Pecos, TX · due Jul 2028 · NextEra Energy Interconnection Holdings, LLC
  30. Tetris Solar—359MWProject · Solar · Zapata, TX · due Jul 2029 · NextEra Energy Interconnection Holdings, LLC
  31. Oasis wind—350MWProject · Wind · Crockett, TX · due Jul 2030 · NextEra Energy Interconnection Holdings, LLC
  32. Slager Lake Wind—310.2MWProject · Wind · Reagan, TX · due Jul 2029 · NextEra Energy Resources Interconnection Holdings, LLC
  33. Bighorn Ridge Solar—300MWProject · Solar · Pecos, TX · due Dec 2027 · NextEra Energy Resources - ERCOT
  34. NextEra Energy Resources Interconnection Holdings, LLC—300MWProject · Solar + storage · Laramie, WY · due Dec 2025 · NextEra Energy Resources Interconnection Holdings, LLC
  35. NextEra Energy Resources Interconnection Holdings, LLC—300MWProject · Solar + storage · Platte, WY · due Dec 2025 · NextEra Energy Resources Interconnection Holdings, LLC
  36. NextEra Energy Resources Interconnection Holdings, LLC—300MWProject · Solar + storage · Power, ID · due Oct 2027 · NextEra Energy Resources Interconnection Holdings, LLC
  37. NextEra Energy Resources Interconnection Holdings, LLC—300MWProject · Solar + storage · Sweetwater, WY · due Jun 2025 · NextEra Energy Resources Interconnection Holdings, LLC
  38. NextEra Energy Resources Interconnection Holdings, LLC—300MWProject · Solar + storage · Sweetwater, WY · due Jun 2025 · NextEra Energy Resources Interconnection Holdings, LLC
  39. NextEra Energy Resources Interconnection Holdings, LLC—300MWProject · Storage · Owyhee, ID · due Dec 2025 · NextEra Energy Resources Interconnection Holdings, LLC
  40. NextEra Energy—300MWProject · Solar + storage · Bernalillo, NM · due Jun 2025 · NextEra Energy
  41. Selenite Springs Solar—253MWProject · Solar · Pecos, TX · due Aug 2028 · NextEra Energy Resources - ERCOT
  42. Pioneer Creek Wind, LLC—252MWProject · Wind · Ford, KS · due Mar 2027 · Nextera Energy Resources
  43. Desert Hill Solar—250.5MWProject · Solar · Culberson, TX · due Jul 2030 · NextEra Energy Interconnection Holdings, LLC
  44. Bob Creek Wind—239.5MWProject · Wind · Sterling, TX · due Jul 2028 · NextEra Energy Interconnection Holdings, LLC
  45. Bigway Solar II—206MWProject · Solar · King, TX · due Dec 2027 · NextEra Energy Interconnection Holdings, LLC
  46. Cornicello Solar—206MWProject · Solar · Limestone, TX · due Apr 2029 · NextEra Energy Interconnection Holdings, LLC
  47. Supra Wind—205.9MWProject · Wind · Hardeman, TX · due Dec 2027 · NextEra Energy Interconnection Holdings, LLC
  48. Ninnescah Flats Solar—201.6MWProject · Solar · Pratt, KS · due Dec 2026 · Nextera Energy Resources
  49. NextEra Energy Resources Interconnection Holdings, LLC—200MWProject · Solar + storage · Sweetwater, WY · due Jun 2025 · NextEra Energy Resources Interconnection Holdings, LLC
  50. NextEra Energy Resources Interconnection Holdings, LLC—200MWProject · Storage · Jerome, ID · due Jun 2027 · NextEra Energy Resources Interconnection Holdings, LLC
All records in view, sorted by MW, descending
West County Energy CenterPlantOperating4,263MW49%2009EIA-860M
Turkey PointPlantOperating2,978.4MW76%1972EIA-860M
ManateePlantOperating2,951.2MW28%1976EIA-860M
Fort MyersPlantOperating2,680.9MW40%1958EIA-860M
SchererPlantOperating2,673MW37%1982EIA-860M
MartinPlantOperating2,448.5MW40%1994EIA-860M
SanfordPlantOperating2,377.8MW46%1969EIA-860M
Victor J Daniel JrPlantOperating2,229MW54%1977EIA-860M
St LuciePlantOperating2,160MW81%1976EIA-860M
Gulf Clean Energy CenterPlantOperating2,107.5MW10%1959EIA-860M
Okeechobee Clean Energy CenterPlantOperating1,723.1MW68%2019EIA-860M
Dania Beach 7PlantOperating1,447.7MW55%2022EIA-860M
Port EvergladesPlantOperating1,352MW44%2016EIA-860M
Cape CanaveralPlantOperating1,295MW65%2013EIA-860M
RivieraPlantOperating1,295MW67%2014EIA-860M
LauderdalePlantOperating1,215.9MW3%1970EIA-860M
Oleander Power Project LPPlantOperating994.4MW7%2002EIA-860M
William F Wyman HybridPlantOperating862.7MW2%1957EIA-860M
Curtis H Stanton Energy CenterPlantOperating688.3MW56%2003EIA-860M
Lansing SmithPlantOperating661.5MW66%1971EIA-860M
NextEra Energy Resources Interconnection Holdings, LLCProjectPlanned600MW—Oct 2030Berkeley Lab
Trumpet SolarProjectPlanned533MW—Jul 2030ERCOT
Half Moon SolarProjectPlanned512.5MW—Jul 2029ERCOT
Manatee Solar Energy CenterPlantOperating483.5MW—2016EIA-860M
Capshaw SolarProjectPlanned450MW—Jul 2030ERCOT
ZSS SolarProjectPlanned450MW—Dec 2027EIA-860M
Silverton SolarProjectPlanned410MW—Jul 2029ERCOT
Bellingham Cogeneration FacilityPlantOperating386.1MW9%1991EIA-860M
Skyrider WindProjectPlanned370MW—Jul 2028ERCOT
Tetris SolarProjectPlanned359MW—Jul 2029ERCOT
Oasis windProjectPlanned350MW—Jul 2030ERCOT
Slager Lake WindProjectPlanned310.2MW—Jul 2029ERCOT
Bighorn Ridge SolarProjectPlanned300MW—Dec 2027EIA-860M
NextEra Energy Resources Interconnection Holdings, LLCProjectPlanned300MW—Dec 2025Berkeley Lab
NextEra Energy Resources Interconnection Holdings, LLCProjectPlanned300MW—Dec 2025Berkeley Lab
NextEra Energy Resources Interconnection Holdings, LLCProjectPlanned300MW—Oct 2027Berkeley Lab
NextEra Energy Resources Interconnection Holdings, LLCProjectPlanned300MW—Jun 2025Berkeley Lab
NextEra Energy Resources Interconnection Holdings, LLCProjectPlanned300MW—Jun 2025Berkeley Lab
NextEra Energy Resources Interconnection Holdings, LLCProjectPlanned300MW—Dec 2025Berkeley Lab
NextEra EnergyProjectPlanned300MW—Jun 2025Berkeley Lab
Selenite Springs SolarProjectPlanned253MW—Aug 2028ERCOT
Pioneer Creek Wind, LLCProjectUnder construction252MW—Mar 2027EIA-860M
Desert Hill SolarProjectPlanned250.5MW—Jul 2030ERCOT
Bob Creek WindProjectPlanned239.5MW—Jul 2028ERCOT
Bigway Solar IIProjectPlanned206MW—Dec 2027ERCOT
Cornicello SolarProjectPlanned206MW—Apr 2029ERCOT
Supra WindProjectPlanned205.9MW—Dec 2027ERCOT
Ninnescah Flats SolarProjectUnder construction201.6MW—Dec 2026EIA-860M
NextEra Energy Resources Interconnection Holdings, LLCProjectPlanned200MW—Jun 2025Berkeley Lab
NextEra Energy Resources Interconnection Holdings, LLCProjectPlanned200MW—Jun 2027Berkeley Lab

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions