Show on map
138 kV line (OSM way 587103540) — Transmission lineCallisto II Energy Center — Under construction · Battery storage · TX · 303.2 MW · 7.2 mi awayPamela Heights I Energy Center — Under construction · Battery storage · TX · 101.7 MW · 7.2 mi awayImperial Power Plant LLC — Postponed · Gas, reciprocating engine · TX · 12 MW · 10.3 mi awayBESS TX Camarine - BSHOU001 — Under construction · Battery storage · TX · 9.9 MW · 11.9 mi away
  • Storage
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

138 kV line (OSM way 587103540)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
0
All 18 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables3
Osm id587103540
RegionUS-TX
Circuits1
Osm typeway
Frequency60
UndergroundNo
Voltage raw138000
Voltages kv138
Circuits raw1
Scope regionsUS-TX
Voltage class100-161 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source4

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Callisto II Energy Center Under construction Battery storage 7.2 mi 303.2
Pamela Heights I Energy Center Under construction Battery storage 7.2 mi 101.7
Imperial Power Plant LLC Postponed Gas, reciprocating engine 10.3 mi 12
BESS TX Camarine - BSHOU001 Under construction Battery storage 11.9 mi 9.9

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 28, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution