Show on map
376 Nash — Power plant · Storage · Madison Energy Investments LLCMA Acushnet 540R Main St — Filed · Solar + storage · MA · 6 MW · 3.6 mi awayRandall Lane Solar — Under construction · Solar + storage · MA · 10 MW · 4.8 mi awayClems Way Solar — Permitted · Solar · MA · 5 MW · 5.1 mi awayCushman Road Solar — Filed · Solar + storage · MA · 6 MW · 5.6 mi awayBlueWave Capital-Mattapoisett (SREC II) — Postponed · Solar · MA · 4.5 MW · 5.8 mi awayBorrego - Highland Ave — Under construction · Solar + storage · MA · 10 MW · 6.4 mi awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 6.9 mi awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 7.6 mi awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 7.8 mi awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 8.1 mi awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 8.1 mi awayCONGRUITY 360 LLC — Built · Large load · MA · 11.2 mi awaySalt Cod BESS — Filed · Storage · MA · 168 MW · 12.1 mi awayTiverton Power Plant — Postponed · Gas, combined cycle · RI · 289.8 MW · 12.2 mi awaySolar Carver 1 Hybrid — Under construction · Solar + storage · MA · 4 MW · 14.5 mi awaySolar Carver 3 Hybrid — Under construction · Solar + storage · MA · 2 MW · 14.9 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storageran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
17 MWh
Grid
13 kV to Massachusetts Electric Co (ISNE)
Location
Bristol County, Massachusetts
Operated by
Madison Energy Investments LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
2 years since 2024
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Massachusetts Electric Co
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 202558
Capacity factor, 20250.002
Net generation (MWh), 202517
Balancing authority codeISNE

Solar arrays

Array area (acres)
1.6
AC capacity (MW)
0.5
DC capacity (MW)
1.1
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2024

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
MA Acushnet 540R Main St Filed Solar + storage 3.6 mi 6
Randall Lane Solar Under construction Solar + storage 4.8 mi 10
Clems Way Solar Permitted Solar 5.1 mi 5
Cushman Road Solar Filed Solar + storage 5.6 mi 6
BlueWave Capital-Mattapoisett (SREC II) Postponed Solar 5.8 mi 4.5
Borrego - Highland Ave Under construction Solar + storage 6.4 mi 10
Featherbed Lane South Solar Under construction Solar + storage 6.9 mi 2
Snipatuit Road Solar Under construction Solar + storage 7.6 mi 8
Braley Hill North Solar Under construction Solar + storage 7.8 mi 10
Logging Swamp South Permitted Solar 8.1 mi 5
Logging Swamp North Permitted Solar 8.1 mi 5
CONGRUITY 360 LLC Built Large load 11.2 mi
Salt Cod BESS Filed Storage 12.1 mi 168
Tiverton Power Plant Postponed Gas, combined cycle 12.2 mi 289.8
Solar Carver 1 Hybrid Under construction Solar + storage 14.5 mi 4
Solar Carver 3 Hybrid Under construction Solar + storage 14.9 mi 2

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution