4Oaks — Power plant · Solar · USF Surry, LLCSmithfield Solar LLC — Postponed · Solar · NC · 5 MW · 13.0 km awayLongleaf Solar — Postponed · Solar · NC · 5 MW · 15.5 km awaySadie Solar — Postponed · Solar · NC · 5 MW · 18.5 km awaySignature Solar — Postponed · Solar · NC · 5 MW · 19.0 km awayMaple Leaf Solar — Permitted · Solar · NC · 73 MW · 20.0 km awayWilloughby PV1 — Postponed · Solar · NC · 20 MW · 22.9 km away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 12% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
5,167 MWh
Grid
23 kV to Duke Energy Progress - (NC) (CPLE)
Location
Johnston County, North Carolina
Operated by
USF Surry, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2015 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
11 years since 2015
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814319
Location id
L100000811751
Eia plant ids
59534
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
22.90
Transmission owner
Duke Energy Progress - (NC)
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Fuel burned (MMBtu), 202517,630
Capacity factor, 20250.118
Net generation (MWh), 20255,167
Balancing authority codeCPLE

Solar array

Array area (acres)
22.1
AC capacity (MW)
5
DC capacity (MW)
6.5
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2015

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Smithfield Solar LLC Postponed Solar 13.0 km 5
Longleaf Solar Postponed Solar 15.5 km 5
Sadie Solar Postponed Solar 18.5 km 5
Signature Solar Postponed Solar 19.0 km 5
Maple Leaf Solar Permitted Solar 20.0 km 73
Willoughby PV1 Postponed Solar 22.9 km 20

Sources EIA-860M