Adrian — Power plant · Oil · Adrian Public Utilities Comm
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2005
Net generation, 2025
12 MWh
Grid
4 kV to Adrian Public Utilities Comm (SWPP)
Location
Nobles County, Minnesota
Operated by
Adrian Public Utilities CommSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
12MWh
Fuel burned, 2025
78MMBtu
Capacity factor, 2025
0.1%
Heat rate, 2025
6,500Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
202512780.1%6,500
2024215410.1%25,762
20237840.0%12,000
2022211850.1%8,810
2021171540.1%9,059
2020121480.1%12,333
2019918360.5%9,187
2018131400.1%10,769
2017201530.1%7,650
20168780.1%9,750
2015242170.1%9,042
2014383450.2%9,079
2013878010.5%9,207
201210980.1%9,800
20118780.1%9,750
2010181630.1%9,056
20098770.1%9,625
2008141300.1%9,475
2007342890.2%8,500
20069930.1%10,333
2005433770.2%8,768
20042170.0%8,492
200300——
200200——
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution