Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 31% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 1,878,018 MWh
- Grid
- 230 kV to Southern California Edison Co (CISO)
- Location
- Orange County, California
- Operated by
- AES Huntington Beach Energy, LLC
Operations
- Net generation, 2025
- 1,878,018
MWh - Fuel burned, 2025
- 12,981,821
MMBtu - Capacity factor, 2025
- 30.7
% - Heat rate, 2025
- 6,912
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 913,282 | 6,431,954 | — | 7,043 |
| 2025 | 1,878,018 | 12,981,821 | 30.7% | 6,912 |
| 2024 | 2,415,040 | 16,481,976 | 39.3% | 6,825 |
| 2023 | 3,045,220 | 21,257,862 | 49.7% | 6,981 |
| 2022 | 3,914,996 | 26,791,160 | 63.9% | 6,843 |
| 2021 | 3,841,745 | 26,237,976 | 62.7% | 6,830 |
| 2020 (11 of 12 months) | 1,285,167 | 9,242,757 | — | 7,192 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.