Show on map
AES Thames — Power plant · Coal · AES Thames LLCSubase Microgrid Project — Gas, reciprocating engine · CT · 13.1 MW · 3.4 km awayGroton Flanders Road Landfill — Solar · CT · 5 MW · 9.7 km awayCMEEC - Hollyhock Solar — Solar · CT · 6 MW · 11.1 km away
  • Combustion
  • Wind & solar
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 74% of 2010 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1989
Net generation, 2010
1,390,984 MWh
Location
New London County, Connecticut
Operated by
AES Thames LLC

Output

Net generation MWh by year, 2001 to 2011
Fuel burned MMBtu by year, 2001 to 2011
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
37 years since 1989
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
AES Thames LLC
Share pct
100
Gem entity id
E100001001193
Unit ids
G100000100062
Location id
L100000103816
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000316015
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001221

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2012
Capacity retired
213.9 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Conventional Steam Coal213.9 MWRetiredDecember 2012

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
AES Thames LLC Operator EIA-860M
AES Corp Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit GEN1 scheduled to retire, 213.9 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Subase Microgrid Project Postponed Gas, reciprocating engine 3.4 km 13.1
Groton Flanders Road Landfill Under construction Solar 9.7 km 5
CMEEC - Hollyhock Solar Postponed Solar 11.1 km 6

Sources EIA-860M

Sources

Attribution