Show on map
Airline - White Oak 138 kV — Transmission lineBESS TX Camarine - BSHOU001 — Under construction · Storage · TX · 9.9 MW · 3.4 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 8.5 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 10.3 mi awayTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 11.6 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 11.7 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 11.7 mi awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 12.0 mi awaySMT DC Houston II (Houston data centre) — Filed · Large load · TX · 14.4 mi awaySERVERFARM LONGHORN — Under construction · Large load · TX · 14.6 mi away
  • Combustion
  • Storage
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Airline - White Oak 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Centerpoint Energy Houston Electric

Details

Who’s behind it

Owner
Centerpoint Energy Houston Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
3
Substations at the ends (as the source names them)
Airline to White Oak
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcenterpoint energy houston electric
HIFLD line ID312956
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
BESS TX Camarine - BSHOU001 Under construction Storage 3.4 mi 9.9
TX Houston 7080 Express Lane Postponed Storage 8.5 mi 1.5
Greens Bayou 6 Under construction Gas, combustion turbine 10.3 mi 445
Texas Petrochemicals Postponed Gas, combined cycle 11.6 mi 560
Pamela Heights I Energy Center Under construction Storage 11.7 mi 101.7
Callisto II Energy Center Under construction Storage 11.7 mi 303.2
CPV Pondera King Energy Center Postponed Gas, combined cycle 12.0 mi 900
SMT DC Houston II (Houston data centre) Filed Large load 14.4 mi
SERVERFARM LONGHORN Under construction Large load 14.6 mi

Sources EIA-860M · ERCOT · FAA OE/AAA · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 13, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026

Attribution