Show on map
ALDI DC 2 — Power plant · Solar · ALDI Inc.Ellington Solar One — Postponed · Solar · CT · 2 MW · 3.6 mi awayCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 6.9 mi awayWindsor Locks — Under construction · Solar · CT · 1.8 MW · 7.2 mi awayDollar Tree Solar One — Postponed · Solar · CT · 2 MW · 8.2 mi awayHomestead Fuel Cell — Postponed · Gas, other · CT · 8.4 MW · 8.7 mi awayHartford Hospital Cogeneration — Postponed · Gas, combustion turbine · CT · 11.5 MW · 8.7 mi awayNU - WETHERSFIELD DATA CENTER — Built · Large load · CT · 11.4 mi awayBroadleaf Solar — Filed · Solar · CT · 200 MW · 11.5 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 12% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
1,269 MWh
Grid
0.5 kV to NSTAR Electric Company (ISNE)
Location
Hartford County, Connecticut
Operated by
ALDI Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

Owner
ALDI Inc.Source100.0%, EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules, as of Dec 31, 2025

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814407
Location id
L100000811838
Eia plant ids
62615
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
0.500
Transmission owner
NSTAR Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 20254,328
Capacity factor, 20250.121
Net generation (MWh), 20251,269
Balancing authority codeISNE

Solar array

Array area (acres)
6.3
AC capacity (MW)
1.2
DC capacity (MW)
1.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Ellington Solar One Postponed Solar 3.6 mi 2
CT Airport Authority Solar One Announced Solar 6.9 mi 4
Windsor Locks Under construction Solar 7.2 mi 1.8
Dollar Tree Solar One Postponed Solar 8.2 mi 2
Homestead Fuel Cell Postponed Gas, other 8.7 mi 8.4
Hartford Hospital Cogeneration Postponed Gas, combustion turbine 8.7 mi 11.5
NU - WETHERSFIELD DATA CENTER Built Large load 11.4 mi
Broadleaf Solar Filed Solar 11.5 mi 200

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution