Show on map
Allen 1 Battery Energy Storage System — Power plant · Storage · Duke Energy Carolinas, LLCAllen 2 BESS — Announced · Storage · NC · 167 MW · 1.0 mi awayDLR Moores Chapel Mobile Crane (Charlotte data centre) — Filed · Large load · NC · 4.7 mi awayCLT16 - Data Center — Filed · Large load · NC · 11.0 mi awayCLT 16 12MW DATA CENTER — Under construction · Large load · NC · 11.0 mi awayQTS-CLT1-DC2 Crane — Filed · Large load · SC · 11.4 mi awayHornet Solar — Under construction · Solar · NC · 73 MW · 13.6 mi awayMcDowell Creek Solar LLC — Under construction · Solar · NC · 2 MW · 14.9 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Allen 1 Battery Energy Storage System

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
100 kV to Duke Energy Carolinas, LLC (DUK)
Location
Gaston County, North Carolina
Operated by
Duke Energy Carolinas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
100
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-1,510
Balancing authority codeDUK
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -1510.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Allen 2 BESS Announced Storage 1.0 mi 167
DLR Moores Chapel Mobile Crane (Charlotte data centre) Filed Large load 4.7 mi
CLT16 - Data Center Filed Large load 11.0 mi
CLT 16 12MW DATA CENTER Under construction Large load 11.0 mi
QTS-CLT1-DC2 Crane Filed Large load 11.4 mi
Hornet Solar Under construction Solar 13.6 mi 73
McDowell Creek Solar LLC Under construction Solar 14.9 mi 2

Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES

Sources

Attribution