53 assets · 11 projects
53 assets · 11 projects. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 7 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, canceled, frozen or not stated). Each is in its tab below.
Duke Energy Carolinas, LLC
Utility
Key facts
Utility- Capacity held
- 25,847.7MW
- Assets
- 53
- States
- NC, SC
- Registered in
- United States
- Parent
- Duke EnergyOwnership claimOwnership link recorded from the companies' own published statements; no date stated by the source.
Gross output of plants with a stake
37 of 39 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 37 of 39 plants with a stake: US plants with an EIA monthly series.69% of the output is from 36 plants recorded as wholly owned.36 plants: operator, wholly owned per EIA-860.Not included: 14 plants it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Nuclear
- Hydro
- Solar
- Storage
Yearly totals
| Year | Nuclear | Hydro | Solar | Storage | Total (MWh) |
|---|---|---|---|---|---|
| 2026 (part year) | 39,815,455 | — | 211,133 | -593,765 | 39,432,823 |
| 2025 | 61,340,066 | 1,328,530 | 291,234 | -763,600 | 62,196,230 |
| 2024 | 60,197,269 | 1,826,851 | 308,842 | -723,758 | 61,609,204 |
| 2023 | 59,480,629 | 1,606,514 | 343,157 | -686,054 | 60,744,246 |
| 2022 | 59,538,303 | 1,696,849 | 330,473 | -700,612 | 60,865,013 |
| 2021 | 60,454,296 | 1,950,199 | 288,109 | -612,701 | 62,079,903 |
| 2020 | 59,945,886 | 3,016,689 | 143,817 | -509,323 | 62,597,069 |
| 2019 | 61,066,543 | 2,397,329 | 136,167 | -719,881 | 62,880,158 |
| 2018 | 59,936,028 | 2,813,824 | 124,147 | -536,968 | 62,337,031 |
| 2017 | 60,300,963 | 1,486,573 | 120,097 | -873,359 | 61,034,274 |
| 2016 | 60,619,656 | 1,561,871 | 6,731 | -779,589 | 61,408,669 |
| 2015 | 59,853,203 | 1,879,492 | 5,962 | -780,463 | 60,958,194 |
| 2014 | 57,491,095 | 1,882,163 | 6,327 | -732,113 | 58,647,472 |
| 2013 | 59,084,815 | 2,655,347 | 6,510 | -619,716 | 61,126,956 |
| 2012 | 56,444,931 | 1,360,177 | 3,666 | -641,599 | 57,167,175 |
| 2011 | 56,962,188 | 1,395,700 | 2,409 | -660,399 | 57,699,898 |
| 2010 | 58,757,530 | 1,843,567 | 3,548 | -688,969 | 59,915,676 |
| 2009 | 57,819,243 | 1,992,761 | — | -722,375 | 59,089,629 |
| 2008 | 56,227,552 | 1,022,701 | — | -959,204 | 56,291,049 |
| 2007 | 56,602,445 | 1,175,094 | — | -902,742 | 56,874,797 |
| 2006 | 55,205,103 | 1,491,018 | — | -807,553 | 55,888,568 |
| 2005 | 57,412,178 | 2,222,306 | — | -858,150 | 58,776,334 |
| 2004 | 55,446,839 | 2,146,010 | — | -793,127 | 56,799,722 |
| 2003 | 55,565,092 | 2,871,222 | — | -890,793 | 57,545,521 |
| 2002 | 58,353,351 | 1,104,392 | — | -853,096 | 58,604,647 |
| 2001 | 56,154,593 | 931,669 | — | -752,174 | 56,334,088 |
Projects 18
Capacity
1.53 GW
0.50 GW active
1 with no MW stated
2 no longer listedNo longer listedThese projects were last stated as active but are no longer listed in any register, so they are not counted as active.
Sources EIA-860M · Berkeley Lab · Permitting Dashboard
Assets 53
Assets
53
Capacity
25,848 MW
- Nuclear: 7,518 MW, 3 assets
- Gas, steam turbine: 6,141 MW, 3 assets
- Gas, combustion turbine: 4,143 MW, 5 assets
- Pumped hydro storage: 2,454 MW, 2 assets
- Gas, combined cycle: 2,350 MW, 3 assets
- Other: 3,242 MW, 37 assets
Operates 53 power plants · Owns 1 power plant
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Ownership 1
Companies
1
Parents
1
Subsidiaries
0
direct
-
Duke Energy Ultimate parent 144 assets62,152 MWwith the companies below
-
Duke Energy Carolinas, LLC This company · share not stated 46 assets23,868.3 MW
-
Duke Energy Florida, LLC Subsidiary · share not stated 46 assets13,649.9 MW
-
Duke Energy Florida Solar Solutions Subsidiary · share not stated 1 asset4.9 MW
-
Duke Energy Indiana, LLC Subsidiary · share not stated 15 assets7,812.6 MW
-
Duke Energy Kentucky Inc Subsidiary · share not stated 6 assets1,352.5 MW
-
Duke Energy Ohio Inc Subsidiary · share not stated 3 assets1,876.8 MW
-
Duke Energy Progress - (NC) Subsidiary · share not stated 28 assets14,359 MW
-
The same companies as a table, with each ownership claim
| Company. Sort by company, A to Z | Relationship, sorted ascending. Sort by relationship, subsidiaries first | Assets. Sort by assets held, largest first | Asset types |
|---|---|---|---|
| Duke EnergyOwnership link recorded from the companies' own published statements; no date stated by the source. | Parent | — | — |
Sources 5
Registers
5
Reuse terms
- 3 Open license
- 2 Open license, with credit
Latest read
2026-11-16
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
-
View at source →
Berkeley Lab ·
LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)
Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. · license
Publication page https://eta-publications.lbl.gov/publications/queued-2026-edition-characteristics, retrieved 2026-10-23 (HTTP 200) — "Copyright Notice: The Queued Up data file is licensed CC BY 4.0. You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." and "Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. CC BY 4.0. All rights reserved." The file's Introduction sheet adds the DOE contract notice ("This dataset has been authored by an author at Lawrence Berkeley National Laboratory under Contract No. DE-AC02-05CH11231 with the U.S. Department of Energy ...") and the standard no-warranty disclaimer
-
View at source →
Permitting Dashboard ·
Federal Permitting Dashboard (FAST-41) full dataset — Socrata
public domain
Around this company
Nearby 83
within 15 miProjects
83
within 15 mi
Nearest
0.0 mi
Craggy Energy Storage
All 83NearbyShowing all 83 nearby projects. The 50 nearest fill 49 rows, as a project's generator units share a row.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Under construction | Craggy Energy Storage | Storage | 30.5 MW | 0.0 mi away | nearest: Craggy Energy Storage |
| Postponed | James E. Rogers Energy Complex | Coal | 800 MW | 0.0 mi away | nearest: James E. Rogers Energy Complex |
| Announced | Allen 2 BESS | Storage | 167 MW | 0.2 mi away | nearest: G G Allen |
| Postponed | Reidsville Energy Center | Gas, combined cycle | 543.9 MW | 0.3 mi away | nearest: Rockingham County CT Station |
| Filed | DLR Moores Chapel Mobile Crane (Charlotte data centre) | Large load | — | 0.5 mi away | nearest: DE Solar 10240 Old Dowd Rd |
| Postponed | Riverside BESS | Storage | 5 MW | 0.6 mi away | nearest: Craggy Energy Storage |
| Postponed | Flip Solar | Solar | 15.8 MW | 0.8 mi away | nearest: Buzzard Roost GT |
| Postponed | Pinewood Solar Center LLC | Solar | 5 MW | 0.9 mi away | nearest: Rockingham County CT Station |
| Postponed | Cleveland Cnty Generating Facility | Gas, combustion turbine | 736 MW | 1.1 mi away | nearest: Mill Creek (SC) |
| Postponed | Lotus Solar | Solar | 4 MW | 1.6 mi away | nearest: Frieden |
| Postponed | Higgins Solar | Solar | 5 MW | 1.8 mi away | nearest: Red Bud Solar Plant |
| Under construction | Maiden Creek Battery | Storage | 50 MW | 1.8 mi away | nearest: Maiden Creek Solar Power Plant |
| Postponed | Bonnie Solar | Solar | 5 MW | 2.3 mi away | nearest: Red Bud Solar Plant |
| Filed | QTS-CLT1-DC2 Crane | Large load | — | 2.3 mi away | nearest: Catawba |
| Postponed | Austin Solar | Solar | 2 MW | 2.4 mi away | nearest: Maiden Creek Solar Power Plant |
| Postponed | Eisenhower Solar | Solar | 5 MW | 2.4 mi away | nearest: Red Bud Solar Plant |
| Under construction | Baxter Creek Solar × 2 units | Solar | 60 MW | 2.5 mi away | nearest: Mocksville Solar |
| Postponed | Duroc Holdings | Solar | 5 MW | 2.5 mi away | nearest: Mocksville Solar |
| Postponed | Innovative Solar 33 | Solar | 30.5 MW | 2.5 mi away | nearest: James E. Rogers Energy Complex |
| Under construction | Parkwood BESS | Storage | 11.6 MW | 2.7 mi away | nearest: Monroe Solar Facility |
| Under construction | McDowell Creek Solar LLC | Solar | 2 MW | 2.7 mi away | nearest: McGuire |
| Postponed | Woodfin | Gas, combustion turbine | 45.5 MW | 2.9 mi away | nearest: Craggy Energy Storage |
| Postponed | Gedosch Solar II | Solar | 2 MW | 3.0 mi away | nearest: W S Lee |
| Under construction | Hornet Solar | Solar | 73 MW | 3.1 mi away | nearest: Lincoln Combustion |
| Postponed | RJ Solar | Solar | 5 MW | 3.3 mi away | nearest: Lookout Shoals |
| Under construction | Nebo Energy Storage | Storage | 2.7 MW | 3.5 mi away | nearest: Bridgewater |
| Built | Microsoft Corporation, CLT10 | Large load | — | 3.6 mi away | nearest: Maiden Creek Solar Power Plant |
| Postponed | Shadow Solar | Solar | 3 MW | 4.1 mi away | nearest: James E. Rogers Energy Complex |
| Postponed | Ten Governors Solar | Solar | 28 MW | 4.2 mi away | nearest: Buzzard Roost GT |
| Postponed | Hawkins Solar | Solar | 5 MW | 4.4 mi away | nearest: Rockingham County CT Station |
| Postponed | Adams Solar | Solar | 2 MW | 4.4 mi away | nearest: Rockingham County CT Station |
| Built | Apple Inc. | Large load | — | 5.0 mi away | nearest: Maiden Creek Solar Power Plant |
| Postponed | Osceola Solar, LLC | Solar | 5 MW | 5.1 mi away | nearest: Frieden |
| Postponed | Big Boy Solar | Solar | 3 MW | 5.6 mi away | nearest: Frieden |
| Under construction | Bear Branch Solar | Solar | 34.5 MW | 5.6 mi away | nearest: Belews Creek |
| Postponed | Bear Poplar Solar | Solar | 5 MW | 5.7 mi away | nearest: Woodleaf Solar Facility |
| Postponed | Jackson Solar Farm | Solar | 5 MW | 5.7 mi away | nearest: Monroe Solar Facility |
| Under construction | CLT04 LYLE Creek Data Center | Large load | — | 6.0 mi away | nearest: Oxford Dam |
| Filed | Clark Creek Solar Plant | Solar + storage | 54 MW | 6.2 mi away | nearest: Maiden Creek Solar Power Plant |
| Postponed | Colin Solar | Solar | 4 MW | 6.4 mi away | nearest: James E. Rogers Energy Complex |
| Postponed | Tarpon Solar I | Solar | 2 MW | 6.7 mi away | nearest: Duke Energy CHP at Clemson University |
| Postponed | Katherine Solar | Solar | 5 MW | 7.0 mi away | nearest: Frieden |
| Built | Bellsouth Telecommunications, LLC DBA at&T North Carolina | Large load | — | 7.0 mi away | nearest: Mill Creek (SC) |
| Under construction | West River Solar, LLC | Solar | 40 MW | 7.3 mi away | nearest: Frieden |
| Postponed | Carter Solar | Solar | 5 MW | 7.5 mi away | nearest: Red Bud Solar Plant |
| Postponed | Mayodan Farm | Solar | 5 MW | 7.6 mi away | nearest: Rockingham County CT Station |
| Postponed | Hawk Solar | Solar | 5 MW | 7.8 mi away | nearest: Red Bud Solar Plant |
| Postponed | Bradley Farm | Solar | 5 MW | 7.8 mi away | nearest: James E. Rogers Energy Complex |
| Postponed | Shakespeare Solar | Solar | 5 MW | 8.2 mi away | nearest: James E. Rogers Energy Complex |
Sources EIA-860M · FAA OE/AAA · EPA ICIS-Air · EPA ICIS-NPDES