Allen — Power plant · Gas, combined cycle · Tennessee Valley AuthorityCOLOSSUS DATA CENTER — Large load · TN · 1.7 km away330T - Gun Range Datacenter — Large load · MS · 14.3 km away5C MEM01 INC — Large load · TN · 19.9 km awayOPPIDAN DATA CENTER — Large load · TN · 24.3 km away
  • Combustion
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 52% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1972
Net generation, 2025
5,845,135 MWh
Grid
161 kV to Tennessee Valley Authority (TVA)
Location
Shelby County, Tennessee

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
54 years since 1972
Unused energy
5,456 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
6,412 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Tennessee Valley Authority
Share pct
100
Gem entity id
E100000002329
Unit ids
G100000100127, G100000100128, G100000100129, G100000401666, G100000403582, G100000403583, G100000403584, G100000403585
Location id
L100000104184
Eia plant ids
3393
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000374130
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000916
Fuel burned (MMBtu), 202537,480,608
Capacity factor, 20250.517
Heat rate (Btu/kWh), 20256,412.3
Net generation (MWh), 20255,845,135
Balancing authority codeTVA

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
1,491.6 MW
Generators retired
21
Capacity still in service
1,290.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal330 MWRetiredMarch 2018
2Conventional Steam Coal330 MWRetiredMarch 2018
3Conventional Steam Coal330 MWRetiredMarch 2018
G10Petroleum Liquids23.9 MWRetiredMay 2025
G11Petroleum Liquids23.9 MWRetiredMay 2025
G12Petroleum Liquids23.9 MWRetiredMay 2025
G13Petroleum Liquids23.9 MWRetiredMay 2025
G14Petroleum Liquids23.9 MWRetiredMay 2025
G15Petroleum Liquids23.9 MWRetiredMay 2025
G16Petroleum Liquids23.9 MWRetiredMay 2025
G17Petroleum Liquids59.6 MWRetiredMay 2025
G18Petroleum Liquids59.6 MWRetiredMay 2025
GT1Petroleum Liquids23.9 MWRetiredMay 2025
GT2Petroleum Liquids23.9 MWRetiredMay 2025
GT3Petroleum Liquids23.9 MWRetiredMay 2025
GT4Petroleum Liquids23.9 MWRetiredMay 2025
GT5Petroleum Liquids23.9 MWRetiredMay 2025
GT6Petroleum Liquids23.9 MWRetiredMay 2025
GT7Petroleum Liquids23.9 MWRetiredMay 2025
GT8Petroleum Liquids23.9 MWRetiredMay 2025
GT9Petroleum Liquids23.9 MWRetiredMay 2025
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Conventional Steam Coal990 MW
Petroleum Liquids501.6 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
161 kV
Transmission or distribution system owner
Tennessee Valley Authority
Balancing authority
Tennessee Valley Authority
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleAs ofSource
Tennessee Valley Authority Operator EIA-860M
U.S. Government Owner 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units G10, G11, G12, G13, G14, G15, G16, G17, G18, GT1, GT2, GT3, GT4, GT5, GT6, GT7, GT8, GT9 scheduled to retire, 501.6 MW · EIA-860M
  • Stated Units 1, 2, 3 scheduled to retire, 990 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
COLOSSUS DATA CENTER Built Large load 1.7 km
330T - Gun Range Datacenter Filed Large load 14.3 km
5C MEM01 INC Built Large load 19.9 km
OPPIDAN DATA CENTER Built Large load 24.3 km