Alliant SBG 9802 Toyota
- Combustion
- Loads
- In development
- Retired
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- In development
- Retired
- Size not stated
Alliant SBG 9802 Toyota: location and 6 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Alliant SBG 9802 Toyota
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 0% of 2024 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1998
- Net generation, 2024
- 10 MWh
- Grid
- 0.5 kV to Linn County REC (MISO)
- Location
- Linn County, Iowa
- Operated by
- Industrial Energy Applications IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 28 years since 1998
- Heat rate
- 9,592 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 47 |
| Capacity factor, 2025 | 0.001 |
| Heat rate (Btu/kWh), 2025 | 9,591.8 |
| Net generation (MWh), 2025 | 4.90 |
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- October 2025
- Capacity retired
- 1 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 01 | Natural Gas Internal Combustion Engine | 1 MW | Retired | October 2025 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 0 kV
- Transmission or distribution system owner
- Linn County REC
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
Transmission lines within 15 mi (6)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 01 scheduled to retire, 1 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Data Center Filed | Large load | 7.7 mi | |
| Cedar Rapids Data Center Filed | Large load | 8.0 mi | |
| QTS Data Center Filed | Large load | 8.4 mi | |
| QTS East Data Center - Temporary Crane Filed | Large load | 8.5 mi | |
| Mobile Cranes (Cedar Rapids data centre) Filed | Large load | 8.5 mi | |
| Suffolk/DataCenter/MobileCrane/DC5/Laydown Filed | Large load | 8.9 mi |
Sources FAA OE/AAA