Show on map
Alpha Value Solar — Power plant · Solar · SunStrong Management, LLCPerquimans Solar LLC — Solar · NC · 5 MW · 5.0 km awayPeanut Farm — Solar · NC · 1.8 MW · 12.1 km awayTanglewood Solar, LLC — Solar · NC · 8.4 MW · 19.9 km awayTanglewood BESS — Storage · NC · 3.9 MW · 21.2 km away
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Alpha Value Solar

Power plant · Solar

Key facts

Power plant · Solarran 21% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
9,023 MWh
Grid
34 kV to Virginia Electric & Power Co (PJM)
Location
Perquimans County, North Carolina
Operated by
SunStrong Management, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2019 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
7 years since 2019
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814418
Location id
L100000811849
Eia plant ids
62054
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Virginia Electric & Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 202530,787
Capacity factor, 20250.206
Net generation (MWh), 20259,023
Balancing authority codePJM

Solar arrays

Array area (acres)
32.6
AC capacity (MW)
5
DC capacity (MW)
6.9
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2019

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Perquimans Solar LLC Postponed Solar 5.0 km 5
Peanut Farm Postponed Solar 12.1 km 1.8
Tanglewood Solar, LLC Under construction Solar 19.9 km 8.4
Tanglewood BESS Under construction Storage 21.2 km 3.9

Sources EIA-860M

Sources

Attribution