Show on map
- Wind & solar
- Storage
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Under construction
- Operating
Alpine Solar: location and 9 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Alpine Solar
Power plant · Solar
Key facts
Power plant · Solarran 20% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2013
- Net generation, 2025
- 114,054 MWh
- Grid
- 66 kV to Southern California Edison Co (CISO)
- Location
- Los Angeles County, California
- Operated by
- Alpine BESS LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 13 years since 2013
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 389,153 |
| Capacity factor, 2025 | 0.197 |
| Net generation (MWh), 2025 | 114,054 |
| Balancing authority code | CISO |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 341
- AC capacity (MW)
- 66
- DC capacity (MW)
- 86.4
- Mounting
- Fixed tilt
- Site type
- Greenfield
- Began operating
- 2013
Source USPVDB
Source
- U.S. Large-Scale Solar Photovoltaic DatabaseMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- U.S. Large-Scale Solar Photovoltaic Database (USPVDB) — USGS and LBNL; one row per facility with its array footprintMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Alpine Solar Withdrawn | Solar | 0.0 km | 66 |
| Gaskell West Storage 1, LLC Under construction | Storage | 6.3 km | 21.6 |
| Solar Star 3 Under construction | Solar + storage | 7.4 km | 24 |
| Solar Star 4 Under construction | Solar + storage | 7.4 km | 24 |
| Neenach Solar Center Postponed | Solar | 9.2 km | 1.5 |
| Rosamond South II Under construction | Storage | 9.7 km | 140 |
| Camino Solar Hybrid Postponed | Storage | 16.7 km | 11 |
| Antelope Solar Farm Postponed | Solar | 18.6 km | 20 |
| Portal Ridge Solar A, LLC Postponed | Solar | 23.9 km | 19 |
Sources
- CAISO Public Queue ReportSource: California ISO
- EIA-860M Preliminary Monthly Electric Generator Inventory